10
2.4.3 Connector
(1) Test socket
Insert the mains plug of DUT to this socket for the
polarity test of protective conductor resistance,
insulation resistance and leakage current test.
(2) Terminal for
mains lead
This terminal is connected to a mains supply via
EZYMAIN.
(3) PE-probe
terminal
Connect the Test Lead with alligator clip to this
terminal for the measurement of protective
conductor resistance, and clip the metal parts of
DUT with the alligator clip.
(4) Terminal
for
Extension
leads adaptor
It corresponds to L, N, E of test socket, and the
extension leads adaptor connected with the cord
reel to be plugged to it.
(1)
(3)
(4)
(2)
(3)
(4)
EZYPAT
/SMARTPAT