27
CL II Test Flow
1
. In
s
u
lat
ion
r
es
is
tan
c
e
tes
t
Stand-by state
Connection Check
"CL I" is displayed if Rpe terminal is
integrated in the power cord of DUT.
DUT is OFF.
DUT is ON.
DUT ON Check
Insulation resistance test
DUT is powered on, or
CL2 is pressed.
Press
to halt a
measurement in
process.
Tester performs next
test when CL II switch
is pressed while a test
is halt
ed with “FAIL”
indication.
Voltage value is displayed
while the Tester is connected
to an outlet.
Press to proceed to
the next; continuity test
is regarded as PASS.