5. Commissioning
Instruction / hand-over
The chapter "Safety instructions" must be heeded! (p. 2)
Commissioning is carried out by a specialised firm or by an aut-
horised KESSEL agent (at an additional charge).
The following persons should be present for the hand-over:
- Person authorised to perform the acceptance on behalf of the
building owner
- Specialised firm
In addition, we recommend the participation of operating per-
sonnel/operator, waste disposal contractor
Overview instruction:
5. 1. Making the plant ready for operation
5. 2. Checking the plant
5. 3. Instruction based on the installation and operating in-
structions
5. 4. Drawing up the handover certificate. (see chapter 13)
Once the instruction is completed, the plant must be made
ready for operation.
5.1 Making the plant ready for operation
Prior to commissioning, the plant must be completely cleaned
(including inlets and drains); solids and coarse particles must
be removed.
Both chambers of the plant must be filled UP with clear water
to a height of 1.20 m.
Display/indicator panel
Movement keys/direction keys for guidance
through the program menu
Enter key/OK key
Back key/ESC key
Pilot lamp indicating readiness for operation
Pilot lamp for malfunction message
Mains power supply cable
Mains connection compressor
Connection compressed air sensor
Connection options for external signal
generator
Connection for valve block
Connecting socket for floating contact
0.2
Datum/Uhrzeit
Datum
01.01.2009 Uhrzeit
12:00
0.4
Nenngrößen
EW4
EW6
EW8
EW10
…
EW24
0.3
Klassen
C
D
0.1
Sprache
deutsch
französisch
englisch
0.
Systemstart
Systemdiagnose
1.5
Systeminfo
Uhrzeit:
20:45
Schwimmer: S1
S2
Ereignisse: Netzausfall
Normalphase
System start
System diagnostic
Language
German
French
English
Date/Time
Date
01.01.02009 Time
12:00
Classes
Nominal Size
System information
Time: 20:45
Floater: S1
Events
Main power failure
Normal phase
Inno-Clean_2. Generation_3-sprachig_132Seiten:010-341 Stand 05/07 26.11.2009 12:43 Uhr Seite 108