background image

7

8

Determine the cord length by pulling the cord. Pull at
the end to reduce the drop height, pull at the loop to
increase the drop height. Screw the half cord connector
tight to position the cord drop height (with CCS

®

:

the second cord connector in the double construction).

If necessary, cut the cord by heating it and make a knot
at the end of the cord. Tight this on the extension in
the middle of the master carrier overlap. This creates 
a strong construction.

5

6

By pulling the cord through the big gap of the pulley, 
it will hang straight down the curtain and a good 
operation is guaranteed.

Ensure that the cord runs behind the metal pin in 
the pulley. This avoids slack in the mechanism during 
operation.

CKS

®

& CCS

®

Assemblage

Tips & Suggestions:

• The maximum length for cording / chaining CCS

®

is as follow:

6,10 mtr (20 Ft.) and for CKS

®

is 6 mtr (19.7 Ft.).

• The above sizes are without the pulleys! With pulleys, the sizes are as follow:

centredraw

one-way draw

CCS

®

6,18 mtr (20.27’)

6,17 mtr (20.24’)

CKS

®

6,08 mtr (20’)

6,08 mtr. (20’)

Fix one cord connector onto the end of the cord 
(CCS

®

facing outside, CKS

®

to the middle of the track).

Slide the half cord connector on the other end of the
cord (with CCS

®

, use a normal CCS cord connector),

but do not screw it.

Slide the master carrier, together with the two cord
connectors into the cord channel of the track. 
The cord is lifting out of the track, through the first
gap of the master carrier overlap.

Fix the second cord connector on the opposite cord,
(CCS

®

facing outside, CKS

®

towards the middle of the

track).

Slide the master carrier underlap, together with the cord
connector into the cord channel of the track and fix the
second pulley onto the track.

1

3

4

CCS

®

& CKS

®

Assembly – cord adjustability.

Instructions for assembling CCS

®

& CKS

®

, with cord adjustability.

This application can be made for CCS

®

, as well for CKS

®

. The advantage is that the requested drop height can be deter-

mined at a later stage. This feature makes the system very suitable for pre-assembling. This application is also possible
for one-way draw. Start, repeating the first two steps of the instructions with cord and continue with the steps below.

Necessary items:

Articlenumber:

CCS-track

30010.. ……

Nylon cord

1030401000

CCS Master Carrier Overlap R/L

30157…000

CCS Master Carrier Underlap R/L

30156…000

CCS End Pulley

30301…000

CCS End Pulley Small

30302…000

CKS Cord Connector

3030301000

Drill with bit 1
Lighter (for heathen the nylon cord)

Necessary items:

Articlenumber:

CKS-track

1501001…..

Nylon cord

1030401000

CKS Master Carrier Overlap R/L

1515701000

CKS Master Carrier Underlap R/L

1515601000

CKS Pulley

1530101000

CKS Cord Connector

1530301000

CKS Cord Connector (half)

1530311000

Drill with bit 1
Lighter (for heathen the nylon cord)

2

03-2006

assemblageCKSCCSEng_210306  21-03-2006  13:47  Page 4

Summary of Contents for CKS

Page 1: ...ctors into the cord channel of the track The cord is lifting out of the track through the first gap of the master carrier overlap Fix the second cord connector on the opposite cord CCS facing outside CKS towards the middle of the track Slide the master carrier underlap together with the cord connector into the cord channel of the track and fix the second pulley onto the track 1 3 4 CCS CKS Assembl...

Page 2: ...ation Slide the second pulley onto the track don t screw it and mark the first ball on the opposite chain beside the pulley This must be done on the other side of the side of operation Take off the pulley and count eight balls with CCS nine balls from the marked one Cut the chain after the ninth ball Fix the master carrier overlap on the chain by following exactly the same procedure as described a...

Page 3: ...ation Slide the second pulley onto the track don t screw it and mark the first ball on the opposite chain beside the pulley This must be done on the other side of the side of operation Take off the pulley and count eight balls with CCS nine balls from the marked one Cut the chain after the ninth ball Fix the master carrier overlap on the chain by following exactly the same procedure as described a...

Page 4: ...ctors into the cord channel of the track The cord is lifting out of the track through the first gap of the master carrier overlap Fix the second cord connector on the opposite cord CCS facing outside CKS towards the middle of the track Slide the master carrier underlap together with the cord connector into the cord channel of the track and fix the second pulley onto the track 1 3 4 CCS CKS Assembl...

Page 5: ...ctors into the cord channel of the track The cord is lifting out of the track through the first gap of the master carrier overlap Fix the second cord connector on the opposite cord CCS facing outside CKS towards the middle of the track Slide the master carrier underlap together with the cord connector into the cord channel of the track and fix the second pulley onto the track 1 3 4 CCS CKS Assembl...

Reviews: