background image

11

1. Safety Instructions

Dear Customer,
Before installing and commissioning 
this KESSEL Staufix FKA, please tho-
roughly read through this manual and 
follow all instructions!

Please make sure that nothing was da-
maged during the shipment of this item.  
In case damage did occur during the 
shipment please consult our service de-
partment.

Safety Instructions

During the installation, operation and 
maintenance of this product, all applicable 
safety measures including the correspon-
ding DIN and VDE norms and regulations 
as well as any local or national electrical 
safety precautions should be followed!
This system should not be installed or 
operated in areas designated as explo-
sion risk areas. This system operated on 
electrical currents and contains rotating 
mechanical parts. Not following all of the 

above safety regulations could result in 
damage to the unit, injury or possible 
death to the operator.

Before and service, maintenance or 
repair work is done to the unit the 
power must be disconnected!

It should be checked and confirmed that 
electrical cables as well as all electrical 
systems are in perfect operating conditi-
on. If any of these parts are damaged the 
system should not be placed in operation.  
If the system is already in operation then 
it should be disconnected from the power 
source and no longer operated.
In order to insure proper condition and 
operation of the system, it should be in-
spected and maintained according to DIN 
EN 13564.
We recommend that a service and main-
tenance contract is signed by a professi-
onal licensed service company.

During backwater or potential backwater 
conditions no service or maintenance is to 
be conducted on the system.
The backwater flaps as well as the emer-
gency backwater flap closure lever should 
always have freely moveable and not be 
blocked or obstructed in anyway.

Note:
VDE 0100, VDE 01107, IEC and local 
EVU regulations (regulations of local 
supplier) should be observed and fol-
lowed. 
The control unit should not be instal-
led or operated in areas designated as 
explosion risk areas.
The operator of this system should fol-
low all instruction in this manual as 
well as manual number 016-003!

Table of contents

1. Safety instructions

 

  

 Page  11

2. General

 

2.1 

Application Staufix FKA 

 Page  12

 

2.2 

Contents of delivery 

 Page  12

 

2.3  

Pre-installation tips 

 Page  12

3. Installation 

3.1 

Concrete slab installation 

 Page  13 

 

3.2 

Extended depth installation in conrete slab 

 Page  14

 

3.3 

Exposed pipe installation 

 Page  14 

 

3.4 

Enstallation in moisture /Grondwater areas 

 Page  14

4. Inspection and Maintenance

 

4.1 Inspection 

 Page  16

 

4.2 Maintenance 

 Page  16

 

4.2.1 

Assembly of lockable cover 

 Page  17

 

4.3 

Operational check according to DIN EN 13564 

 Page  17

 

4.4 

Optical probe check 

 Page  18 

 

4.5 

Emergency closure valve function 

 Page  18

Summary of Contents for 84000S

Page 1: ...tromausfall Bei R ckstau automatische Verriegelung Einfaches Auswechseln von Verschlei teilen Integrierter Einfachr ckstauverschluss f r stromlosen Betrieb w hrend der Bauphase Optimale Rohrreinigung...

Page 2: ...f die Anlage auf keinen Fall in Betrieb genommen wer den bzw ist umgehend abzustellen Zur Aufrechterhaltung der Betriebsf hig keit ist die Anlage entsprechend DIN EN 13564 zu inspizieren und zu warten...

Page 3: ...e en Sie erst bei Inbetriebnah me des KESSEL R ckstauautomaten Staufix FKA die elek trischen Anlagen komponenten Mo tor Son de und Schalt ger t an Bis da hin sind die se Anlagen komponenten entspreche...

Page 4: ...tte Der Grundk rper des KESSEL Staufix FKA ist waagrecht auszurichten Abb 1 F r den Anschluss der elektrischen Lei tungen von Sonde und Antriebsmotor ist bauseits ein Ka belleerrohr mind DN 50 KESSEL...

Page 5: ...e Be sch digung der Bauteile zu verhindern Zum Abnehmen der Schutzhaube ist gleichzeitig an beiden Klemmen einer Seite leicht zu ziehen Vor Demontage des schwarzen Unterteiles der Schutz haube sind Zu...

Page 6: ...ck ist ggf auf die erforderliche H he zu k rzen KESSEL Pumpfix F Staufix FKA Staufix SWA Controllfix Dichtungsset Art Nr 83075 Verl ngerungsst ck Art Nr 83070 BWS BWS Unterbeton Fliesen Estrich D mmun...

Page 7: ...den eine R ckstaugefahr muss ausgeschlossen sein Dabei ist folgendes durchzuf hren Entfernen von Schmutz und Ablage rungen Pr fen von Dichtungen und Dichtfl chen auf einwandfreien Zustand ggf Austausc...

Page 8: ...nicht mehr als 500 ccm Wasser nach gef llt werden muss Nach der Pr fung den Notverschluss 3 wieder ffnen Den Trichter 2 entfernen und die Verschlussschraube 1 mit dem Dichtring in den Deckel einschrau...

Page 9: ...nalit t pr fen Beide Klappen pr fen sie m ssen beide auf betriebsbereiten Zustand ge stellt sein Abb 15 4 Inspektion und Wartung 4 5 Funktion des Notverschlusses Verriegelungsstellung Abb 16 vollst n...

Page 10: ...perational even during power outages Automatic backwater flap closure during backwater Staufix FKA also offer powerless backwater protection during the building phase no power supply to building Upgra...

Page 11: ...he power source and no longer operated In order to insure proper condition and operation of the system it should be in spected and maintained according to DIN EN 13564 We recommend that a service and...

Page 12: ...should not be connected until the system is commissioned after the major const ruction phase of the building is complete It is important that the electrical compo nents of the Staufix FKA contained i...

Page 13: ...installed in the proper direction and is not installed backwards KESSEL back water valves are equipped with flow direc tion arrows to make sure that the valve is installed in the proper direction 3 1...

Page 14: ...to the system This protected cover is not water tight To remove the protective cover simple lift both clips on one side of the cover Before the black lower part of the protective hood is dis mantled t...

Page 15: ...heights requirements KESSEL Pumpfix F Staufix FKA Staufix SWA Controllfix Groundwater protection set 83071 Extension section Article Number 83070 BWS BWS Unterbeton Fliesen Estrich D mmung Betonboden...

Page 16: ...ent of the two flaps as well as the manual clo sure lever lubricate if necessary Check to make sure the system is water tight and in proper operating condition by performing the functi on sealing test...

Page 17: ...d to keep the water level at 10cm If no more than 500ml of water was required to keep the water level at the 10cm mark during the 10 minute test then the valve is considered tight After the test re op...

Page 18: ...manually ope rated backwater flap Final step is to make sure both the motorized and the manually operated backwater flap are in the open position 4 5 Purpose of the emergency closure flap The emergen...

Page 19: ...joints Fiabilit de service m me en panne de courant Verrouillage automatique en cas de re foulement Facilit d change des pi ces d usure Simple clapet anti refoulement int gr pour une exploitation sans...

Page 20: ...cas tre mise en service et ou doit tre imm diatement arr t e Pour conserver l installation en tat d ex ploitation il faut la visiter et l entretenir conform ment la DIN EN 13564 Nous recommandons de p...

Page 21: ...at de livraison Veuillez ne raccorder les composants de l automate de refoulement Staufix FKA moteur sonde et bo tier de commande que lors de la mise en service D ici l stockez les composants de l ins...

Page 22: ...nce avec le au mur pour les op rations de maintenance 3 1 KESSEL Staufix FKA pour pose dans la dalle de fondation Le corps principal du KESSEL Staufix FKA doit tre pos l horizontale voir figure 1 Le r...

Page 23: ...tection pour viter un endommagement des pi ces apr s la mise en service Pour ter le capot de protection il faut tirer l g rement en m me temps sur un c t des deux vis de serrage Avant le d montage de...

Page 24: ...requise KESSEL Pumpfix F Staufix FKA Staufix SWA Controllfix Jeu de joints article n 83075 Pi ce de rallonge article n 83070 BWS BWS Unterbeton Fliesen Estrich D mmung Betonboden Fliesen Estrich D mmu...

Page 25: ...uivants doivent tre ex cut s Retirer la salet et les d p ts Contr ler si les joints et les port es de joint sont en bon tat si n ces saire proc der l change des joints voir figures 9 11 Contr ler la m...

Page 26: ...si pendant ce temps il ne faut pas rajouter plus 500 ccm d eau R ouvrir apr s le contr le de la vanne batardeau 3 Retirer la tr mie 2 et visser la vis de fermeture 1 avec la bague d tan ch it dans le...

Page 27: ...ifier les deux cla pets ils doivent tre mis tous les deux en tat pr t fonctionner Fig 15 4 Inspection et maintenance 4 5 Fonctionnement de la vanne batardeau Position de verrouillage figure 16 vanne b...

Page 28: ...in tubazioni continue Sicurezza di funzionamento anche in caso di interruzione di corrente Bloccaggio automatico in caso di riflusso Facile sostituzione dei particolari soggetti a usura Chiusura antir...

Page 29: ...mediatamente Per conservare la funzionalit l impianto deve essere ispezionato e manutenuto conf DIN EN 13564 Consigliamo di stipulare il contratto di ma nutenzione accluso con l azienda instal latrice...

Page 30: ...tto della consegna Solo alla messa in funzione dell impianto antiriflusso automatico Staufix FKA KES SEL collegare le componenti elettriche dell impianto motore sonda e centrali na Fino a quel momento...

Page 31: ...parete per i lavori di manuten zione 3 1 Staufix FKA KESSEL per il montaggio nella piastra di fondazione Il corpo base dello Staufix FKA KESSEL deve essere allineato orizzontalmente ill 1 Per l allac...

Page 32: ...ornito con una calotta di protezione Per togliere la calotta tirare contemporanea mente i due dispositivi di fissaggio di un lato Prima dello smontaggio della parte inferiore nera della calotta di pro...

Page 33: ...rolfix KESSEL Set di guarnizioni n art 83075 Prolunga n art 83070 BWS BWS Unterbeton Fliesen Estrich D mmung Betonboden Fliesen Estrich D mmung Betonboden Schutzbeton Abdichtung 1 2 3 2 1 Esempio di m...

Page 34: ...i sporco e depositi controllo dello stato di guarnizioni e superfici di tenuta eventualmente sostituzione delle guarnizioni vedi ill 9 11 controllo della meccanica degli or gani di tenuta mobili event...

Page 35: ...re rabboccati pi di 500 cm3 d acqua Dopo il controllo riaprire il dispositivo di chiusura d emergenza 3 Togliere l imbuto 2 e avvitare nel coperchio il tappo a vite 1 con l anello di tenuta Riaprire l...

Page 36: ...arsi nello stato pronto per l uso 4 Ispezione e manutenzione 4 5 Funzione del dispositivo di chiusura d emergenza Posizione di bloccaggio ill 16 disposi tivo di chiusura d emergenza completa mente chi...

Page 37: ...buisleidingen Bedrijfsveiligheid ook bij stroomuitval Bij terugstroming automatische blokkering Eenvoudig vervangen van aan slijtage onderhevige onderdelen Ge ntegreerde enkelvoudige terugs troom afs...

Page 38: ...mag de installatie in geen geval in bedrijf worden genomen of moet direct worden uitgezet Voor handhaving van de functionali teit dient de installatie conform DIN EN 13564 te worden ge nspecteerd en...

Page 39: ...nd Sluit a u b pas bij inbedrijfstelling van de KESSEL automatische terugstroombe veiliging Staufix FKA de elektrische in stallatiecomponenten motor sonde en schakelapparaat aan Deze installatie compo...

Page 40: ...van de automatische terugstroombeveili ging moet voor onderhoudswerkzaamheden op voldoende afstand tot de wand worden gelet 3 1 KESSEL Staufix FKA voor inbouw in de grondplaat Het basislichaam van de...

Page 41: ...wordt geleverd met een beschermkap om te voorkomen dat onderdelen na de inbedrijfstelling beschadigd raken Om de beschermkap weg te nemen moet tegelijkertijd aan beide klemmen van n kant worden getrok...

Page 42: ...fix F Staufix FKA Staufix SWA Controllfix Pakkingset art nr 83075 Verlengstuk Art nr 83070 BWS BWS Unterbeton Fliesen Estrich D mmung Betonboden Fliesen Estrich D mmung Betonboden Schutzbeton Abdichtu...

Page 43: ...stroming moet uitgesloten zijn Hierbij moet het volgende worden uit gevoerd Verwijderen van vuil en afzettingen Controleren of pakkingen en af dichtvlakken in perfecte staat verkeren evtl vervangen va...

Page 44: ...in deze tijd niet meer dan 500 ccm water moet worden bijgevuld Na de controle de noodafsluiter 3 weer openen De trechter 2 verwijderen en de sluitschroef 1 met de afdichtring in de deksel schroeven D...

Page 45: ...e functionaliteit Beide kleppen controleren zij moeten allebei gereed voor bedrijf zijn gezet 4 Inspectie en onderhoud 4 5 Functie van de noodsluiter Vergrendelingsstand afb 16 volledig gesloten nooda...

Page 46: ...omatyczne blokowanie przy przep ywie zwrotnym atwa wymiana cz ci eksploatacyjnych Zintegrowany jednoklapowy zaw r zwrotny gwarantuj cy dzia anie podczas fazy budowlanej bez potrzeby pod czania do napi...

Page 47: ...ia urz dzenia nie wolno w cza lub trzeba je natychmiast wy czy Wceluzachowaniasprawno ciurz dzenia nale y przeprowadza prace inspekcyjne i kon serwacyjne zgodnie z PN EN 13564 Zalecamy zawarcie za czo...

Page 48: ...uru chomienie rozdzia 5 Stan w momencie wydania Elektryczne komponenty urz dzenia pompa sonda urz dzenie sterownic ze nale y pod cza dopiero przy rozru chu automatycznego zaworu zwrotnego KESSEL Stauf...

Page 49: ...o nale y zwr ci uwag na wystarczaj cy odst p od ciany konieczny do wykony wania prac konserwacyjnych 3 1 KESSEL Staufix FKA do zabu dowy w p ycie pod ogowej Korpus KESSEL Staufix FKA nale y wypoziomow...

Page 50: ...arczane z pokryw ochronn aby po rozruchu unikn uszkodze nia podzespo w W celu zdj cia po krywy ochronnej jednocze nie nale y poci gn oba zaciski po bokach Przed demonta em czarnej cz ci dolnej po kryw...

Page 51: ...na raz mo na dostosowa wysoko ko nierza Nasadk mo na w razie potrzeby skr ci do potrzebnej wysoko ci 1 KESSEL Pumpfix F Staufix FKA Staufix SWA Controllfix 2 Zestaw uszczelek nr art 83075 3 Przed u k...

Page 52: ...zwrotnym Nale y przy tym 1 Usun zanieczyszczenia i osady 2 Sprawdzi uszczelki i powierzchnie uszczelniane czy nadal s w niena ganny stanie wraziekonieczno ci wymieni uszczelki patrz rys 9 11 3 Skontr...

Page 53: ...uzupe ni do pierwotnej wysoko ci Zaw r zwrotny mo na uzna za szczelny je li w tym czasie uzupe ni si nie wi cej ni 500 ml wody Po wykonaniu kontroli zamkni cie awaryjne 3 ponownie otworzy Lejek 2 usun...

Page 54: ...yciskiej Kon trola Sprawdzi obie klapy obie musz znajdowa si w stanie gotowym do pracy 4 Inspekcja i konserwacja 4 5 Funkcja zamykania awaryjnego Pozycja ryglowania rys 16 w pe ni zamkni te zamykanie...

Page 55: ...5 lmpermeabilita all acqua I Waterdichtheid Wodoszczelnosc Vandtrethed 16 Superata Geslaagd I przekazywane Oversteget 17 lmpermeabilita agli odori Geurdichtheid Szczelnosc zapachu Lugt trethed 18 Effi...

Page 56: ...56...

Reviews: