NOTICE: Do not actuate the auto-manual
switch with the full load applied to the
generator. Generator over voltage will
result which may cause damage to the
generator control and protection equipment.
Whenever possible, stop the generator
before switching to assure full load is not
applied.
Operation
Initial startup:
generators with both automatic and
manual voltage control
1. Disconnect the generator output from the load by opening the main
circuit breaker.
2. Turn the manual voltage adjust rheostat fully counterclockwise.
3. Put the auto-manual switch in the manual position.
4. Start the prime mover, and bring the set to rated speed. Turn the
manual voltage adjust rheostat to reach rated voltage. Close the
output circuit breaker, and apply load in steps until the rated load is
reached. Adjust the manual adjust rheostat as necessary to obtain the
desired output voltage.
5. Gradually reduce load, and adjust the rheostat accordingly until no
load is reached. Open the circuit breaker, and stop the prime mover.
6. Actuate the auto voltage rheostat. Then start the genset, and bring it
to rated speed. Adjust the voltage to the desired value.
7. Close the output circuit breaker. Then check the generator voltage
and voltage regulation. Apply load in steps until the rated load is
reached.
8. Check for vibration levels at no load and rated load. A slight increase
is normal. As the load is maintained for 2-3 hours, the vibration
levels will gradually increase and reach a fi nal level.
Initial startup: Generators with automatic voltage control
only (generator has an automatic voltage regulator (AVR)
with no auto-manual switch)
1. Disconnect the generator output from the load by opening the main
circuit breaker.
2. Turn the voltage adjust rheostat fully counterclockwise. Start the
prime mover, and bring the set to rated speed. Turn the voltage adjust
rheostat to obtain the desired voltage.
3. Close the output circuit breaker, and apply load in gradual steps
until the rated load is reach. Notice the voltage regulation with the
changes in load steps.
4. Check for vibration levels at no load and rated load. A slight increase
is normal. As the load is maintained for 2-3 hours, the vibration
levels will gradually increase and reach a fi nal level.