Grounding pin
4. Supply air to the system by connecting
the side air line (2) of the vehicle to the
compressor.
Side air line
5. Connect the discharge hose of the
station to the discharge port (3) of the ve-
hicle with the necessary equipment
(adapter etc.).
Discharge port
6. After making the necessary controls
(system pressure, material temperature,
etc.), open the valve on the top air line
and supply air to the top air line (4). (See
section
“
Components
and
Use
of
Upperstructure
”).
Top air line ball valve
7. Open the bottom valve (5) (See sec-
tion
“
Components
and
Use
of
Upperstructure
”).
Pneumatic actuator
8. Start the flow by opening the safety
valve (6). (See section “
Components
and Use of Upperstructure
”).
Safety valve and free blowing mechanism