Note:
Note:
ceramic
tiles
ceramic
tiles
ceramic
tiles
host
machine
box
metal hose
draining pipe
2. Wall tiles: Only metal hose joints
and drain pipe joints that can be
freely retracted are reserved
The slot of metal hoses cannot be filled
with cement. The ceramic tile surface
shall not be lower than the top surface of
the protective box.
The ceramic tile surface shall
not be lower than the top
surface of the protective box
ceramic tile wall
No filler
Metal hose
back water inlet joint
wall
urinal
urinal
draining
pipe
protective
box
ceramic tiles
ceramic tiles
3. Connect the metal hose firmly with the water inlet connector behind the urinal.
4. Hang and secure the urinal, and insert the drain into the reserved groove.
1. Before installing and connecting the sensor host, be sure to wash the sundries in the water
pipe to prevent blocking the solenoid valve filter screen;
2. A sealing ring shall be placed in each connector to prevent water leakage.
KARAT URINAL SENSOR