7 Transporting the machine – 7.2.2 Transporting the machine
199
17 Spray rustproofing on the shafts.
18 Refit the shafts in the frame and lock them with the circlips and
lock screws.
19 Close the relief valve for the attachment and the drain valve for
brake accumulators.
20 Start the machine and check that the hydraulic connections are
sealed.
21 Lubricate the mast’s chains with lubricating grease.
22 Connect the lifting equipment to the hose roller.
23 Release the hydraulic hoses and wiring from the clamps at the
hose roller. Refit the clamps.
24 Release the hose retainer’s support from the mast. Refit the
screws.
25 Attach the hose roller in the top of the mast.
26 Angle the hose retainer up against the mast and attach the hoses
and cables along the side of the mast together with the retainer.
27 Detach and fold away protruding parts which risk being damaged
during transport.
–
Machine parts, removal
1 Switch off the engine and the system voltage with the battery
disconnector.
2 Remove the exhaust system’s end-pipe and secure it on the side
of the machine, by the footstep.
CAUTION
The hydraulic oil can be led the wrong way.
Risk of damage to the hydraulic oil fine filter.
Check that relief valve top lift is closed before starting
the engine.
Check that relief valve attachment is closed before
starting the engine.
Summary of Contents for DCF100-45E7
Page 2: ......
Page 4: ......
Page 9: ...8 1 Foreword 1 3 Inspection and maintenance...
Page 82: ...218 8 Environment and standards...
Page 87: ......