73
English
5 mm
1. Install the heat recovery unit on a wall with a mass of
at least 200 kg/m
2
.
2. Mark the position for the fastening points on the wall.
- Wall Installation
1. Install the heat recovery unit on a ceiling with a mass of
at least 200 kg/m
2
.
2. Mark the position for the fastening points on the
ceiling.
- Ceiling Installation
3. Position the unit in suspension.
Take into consideration a minimum slope of 5 mm
towards the condensate drain.
4. Connect the condensate drain to the domestic sewage
system using a duct or pipe (siphoned).
3. Position the unit.
4. Connect the condensate drain to the domestic sewage
system using a duct or pipe (siphoned).
Summary of Contents for KVX-150 RHQ
Page 2: ......
Page 3: ...INSTRUKCJAOBS UGI OWNER SMANUAL BEDIENUNGSANLEITUNG 5 65 123 PL EN DE...
Page 4: ......
Page 33: ...33 Polski 1 2 3 4 1 2 3 4 60 9 10 8 10 9 57 56 Instalacja sterownika na cianie...
Page 63: ...63 Polski...
Page 64: ......
Page 91: ...91 English 1 2 3 4 1 2 3 4 60 9 10 8 10 9 57 56 Installing controller on the wall...
Page 121: ...121 English...
Page 122: ......
Page 149: ...149 Deutsch 1 2 3 4 1 2 3 4 60 9 10 8 10 9 57 56 Installation der Wandbedieneinheit...
Page 179: ...179 Deutsch...
Page 180: ...kaisai com...