Description
Figure
Upper front panels
30
= 888510.1
➤ Install 2 upper front panels
30
at the upper
side panels, using 4 hex-head screws
54
each.
➤ Place protective caps
55
over the screw
heads.
DN 300 flange collar
31
= 888783.0
➤ Install the DN 300 flange collar
31
at the
discharge port side panel.
Option H11
(Intake from the pipeline)
DN 300 flange collar
31
= 888783.0
➤ Install one flange collar DN 300
31
each at
discharge port side panel and the intake
port side panel.
➤ If not yet done, install the cover for the cable
lead-in at the discharge port side panel.
Option H3
(Outdoor installation)
Weather protection roof, air intake box
32
=
830321.0
Inlet flow control box
33
= 886026.1
➤ Install 2x weather protections for the air in‐
take box
32
at the air intake box, using
4 hex-head screws
54
each.
➤ Fit the inlet flow control box
33
to the inlet
louver, using 4 hex-head screws
54
.
➤ Seal all gaps with silicone.
6
Installation
6.10 Options
54
Installation and Operating Manual Rotary lobe blower
HBPI pr
Number: 9_9572 28 USE