![background image](http://html1.mh-extra.com/html/kaeser-kompressoren/hbpi-pr/hbpi-pr_installation-and-operating-manual_3172311066.webp)
2. Connect cables to the terminal box without mechanical stress.
3. Connect the protective ground.
Further information See electrical diagram in chapter 13.6.9.
6
Installation
6.10 Options
56
Installation and Operating Manual Rotary lobe blower
HBPI pr
Number: 9_9572 28 USE