Maintenance
10 --- 47
Maintenance work may only be carried out:
by persons trained in the machine and persons under the supervi-
sion of an expert,
by experts,
by an authorised KAESER service agent.
Work on electrical devices may only be carried out in accordance with elec-
trical regulations:
by persons trained in the machine under the supervision of an
electrician,
by an electrician,
by an authorised KAESER service agent.
10.2
Maintenance Schedule
Maintenance intervals are recommendations only and should be adjusted
to suit the installation and operating conditions.
According to the way a machine is equipped, sensors and/or maintenance interval
counters monitor the operational state of important functional devices. Necessary mainten-
ance tasks are signalled by the SIGMA controller.
Keep a log of all service work.
This enables the frequency of individual maintenance tasks to be compared with
KAESER’s recommendations. A list is given in chapter 10.15.
10.2.1
Resetting maintenance interval counters
Maintenance interval counters indicate the operating hours between maintenance tasks.
When a maintenance task is completed, reset the corresponding counter to its original
value.
See the SIGMA CONTROL service manual.
Pre --- condition: Maintenance task completed.
Service message reset.
Activate password level 4.
Select the appropriate entry from the maintenance menu.
Select ’reset’ and ’y’ and confirm with the enter key.
Summary of Contents for CSD 82
Page 2: ......
Page 77: ......
Page 78: ......
Page 79: ......
Page 80: ......
Page 81: ......
Page 82: ......
Page 86: ......
Page 87: ......
Page 88: ......
Page 89: ......
Page 90: ......
Page 91: ...Appendix 13 83 13 2 2 Pipeline and instrument flow diagram option C1...
Page 92: ......
Page 93: ......
Page 94: ......
Page 95: ......
Page 96: ......
Page 97: ...Appendix 13 89 13 2 3 Dimensional drawing 13 2 3 1 Air cooling option K1...
Page 98: ......
Page 99: ......
Page 100: ...Appendix 13 92 13 2 3 2 Water cooling option K2...
Page 101: ......
Page 102: ......
Page 103: ...Appendix 13 95 13 2 4 Electrical diagram...
Page 104: ......
Page 105: ......
Page 106: ......
Page 107: ......
Page 108: ......
Page 109: ......
Page 110: ......
Page 111: ......
Page 112: ......
Page 113: ......
Page 114: ......
Page 115: ......
Page 116: ......
Page 117: ......
Page 118: ......
Page 119: ......
Page 120: ......
Page 121: ......
Page 122: ......
Page 123: ......
Page 124: ......
Page 125: ......
Page 126: ......