3.
Update the country settings of the device using country-specific setup files.
4.
Set and check the software settings when commissioning the device.
5.
Optional: Install existing function extension certificates.
6.
Save all changes made in the
User Settings
tab.
8.3
Display
The display shows the device status. Current measurements and fault messages are displayed on this display. The
various basic settings can be made on this display.
8.3.1
Start display
After activation, the name of the device series is briefly displayed.
Fig. 32: Display of the device series
The figure shows the standby display in which you can see that the basic requirements for starting the system have been
met. The PV system must have sufficient voltage for the start and the grid must be connected.
The display is divided into two areas.
The current status, extended measurements, error messages and selection menu are displayed in the left field. The
right field displays basic measurements, the battery status and battery error messages.
The figure shows
Fig. 33: Standby
–
UPV1, UPV2 – Input voltage at PV connections
–
PPV - Total power PV inputs, the sum of power outputs PPV1 and PPV2
–
UL1, UL2, UL3 - Grid voltage at device connection terminals
–
PL1, PL2, PL3 - Device output power per phase
An active Ethernet connection is indicated by the "e" symbol.
Status
P
L1
,
P
L2
,
P
L3
P
PV
U
PV1
,
U
PV2
U
L1
,
U
L2
,