LX-D1010G
13-2 (PA012)
Lead dress when attaching each part
Put the thick lead wire from the
lamp power into the gap so that it
never sticks out of the barrier. Do
not run this lead wire into the Power
Ass’y in order to secure an air duct.
to SN
to SZ
to SF
Lead holder
Cushion
Stick the cushion pulling the
wire toward the left to take in
slack in the wires.
Put the wire into the
gap to take in slack.
Put the wire into the
gap to take in slack.
Cushion
SF
SD
SZ SW
SN
SBX
SGX
SRX
SY
SV
ST
SX
SL
The NN-GN lead wire
should cross the SA-CB2
lead wire.
Cushion
Cushion
Yellow-Green lead
Run this earth wire above
the SY and SV lead wires.
The wire put into the
gap should not interfere
the lighting part and the
screw.
to Power Ass’y
Run the GN lead wire
under the SY lead wire.
Do not position the wires
higher than the Main PWB.
Summary of Contents for LX-D1010G - Lcd Projector
Page 32: ...LX D1010G 4 10 PA012 Memo ...
Page 36: ...LX D1010G 6 2 PA012 Memo ...
Page 67: ... PA012 15 1 LX D1010G 15 BLOCK DIAGRAMS ...
Page 68: ... PA012 15 2 LX D1010G ...
Page 69: ...LX D1010G PA012 15 3 ...
Page 70: ...LX D1010G PA012 16 1 ...
Page 77: ...LX D1010G PA012 Parts 7 Memo ...
Page 81: ...しろページ ...