Charging the battery
Requirements
– Expose the battery, see page 47.
– Correct charging program set on
charger.
Procedure
• Remove the battery connector (52)
from the truck plug (53).
• Remove any insulating mats from the
battery.
• Connect the battery connector (52) to
the charging cable (54) of the
stationary charger.
• Start charging in accordance with the
charger operating instructions.
• Switch on the charger / charging begins automatically.
The battery is now charged.
52
54
53
Completing battery charging, restoring the truck to operation
NOTICE
If charging has been interrupted, the full battery capacity will not be available.
Requirements
– The battery is fully charged.
Procedure
• Complete charging in accordance with the charger operating instructions.
• Disconnect the battery connector (52) from the charging cable (54) of the
stationary charger.
• Attach the battery connector (52) to the industrial truck.
The truck is now ready for operation.
49
10.19 en-GB
Summary of Contents for ESD 220
Page 1: ...ESD 220 06 10 Operating instructions 51190940 10 19 en GB ESD 220...
Page 2: ...2...
Page 4: ...4 10 19 en GB...
Page 10: ...10 10 19 en GB...
Page 12: ...0506 GB 2 0506 GB 2...
Page 16: ...14 10 19 en GB...
Page 21: ...7 8 6 5 7 9 11 10 12 14 16 20 17 15 19 18 13 21 19 10 19 en GB...
Page 27: ...4 2 Dimensions d 25 10 19 en GB...
Page 32: ...5 Identification Points and Data Plates 26 24 25 30 34 33 31 28 22 32 29 23 27 30 10 19 en GB...
Page 38: ...36 10 19 en GB...
Page 44: ...42 10 19 en GB...
Page 56: ...54 10 19 en GB...
Page 59: ...2 Displays and Controls 1 7 10 56 57 23 6 58 12 19 14 59 60 61 20 21 57 10 19 en GB...
Page 77: ...6 8 12 20 10 3 2 7 75 10 19 en GB...
Page 79: ...6 8 12 20 10 3 2 7 77 10 19 en GB...
Page 83: ...20 10 81 10 19 en GB...
Page 122: ...120 10 19 en GB...
Page 158: ......
Page 162: ...02 16 EN 6...
Page 164: ...02 16 EN 8 14 Safety instructions and warning information...
Page 186: ......