119
11
.1
4
E
N
Twin operation
Requirements
– To prepare the truck for operation, see
"Preparing the truck for operation" on
page 99
Procedure
• To lower the load handler and tilt the mast
forward at the same time, push the Multi
Pilot forward and to the right.
• To lift the load handler and tilt the mast
back at the same time, push the Multi Pilot back and to the left.
• To lower the load handler and tilt the mast back at the same time, push the Multi
Pilot forward and to the left.
The mast is now tilted back / forward.
CAUTION!
X
To raise the load safely, set the fork tines as far apart from each other as possible
and centrally to the truck. The load centre of gravity must lie centrally between the
fork tines.
Sideshifter (MULTI-PILOT)
Procedure
Z
The references to left and right are based
on load lifting as viewed from the operator's
position.
• Sideshifter left: Press the control button (79)
in direction (1).
• Sideshifter right: Press the control button
(79) in direction (2).
79
Summary of Contents for DFG 660
Page 3: ...11 14 EN 4...
Page 13: ...11 14 EN 14...
Page 26: ...27 11 14 EN...
Page 47: ...11 14 EN 48...
Page 129: ...11 14 EN 130 8 Optional equipment...
Page 141: ...11 14 EN 142 Drive the truck forward Press down on the hand lever 202...
Page 149: ...11 14 EN 150...