![JUKI LK-1941 Engineer'S Manual Download Page 76](http://html.mh-extra.com/html/juki/lk-1941/lk-1941_engineers-manual_2029921076.webp)
−
71
−
⑥
CP-6 (Hot wire output)
•
This mode is purposed to use for valuation and test by setting hot wire output time longer than that of
normal setting.
•
Setting range is 350 ms to 1,000 ms. (In a uint of 50 ms)
•
Duty = 100%
*
Use CP-5 for normal hot wire output check.
*
The function of CP-6 is for valuation and test.
•
When it is normally used, the load applied to the hot wire plate is large and the plate may be
fused. So, do not operate this function for the normal use.
FORWARD
BACK
or
1
2
READY
Indicating section
Checking measure
Explanation
Step
Output time is increased or decreased by
pressing down
FORWARD
or
BACK
key.
Output of the specified time is performed by
pressing down
READY
key. (Possible continuous
pressing down)
Summary of Contents for LK-1941
Page 2: ......