![JUKI KE-750 Setup Manual Download Page 27](http://html1.mh-extra.com/html/juki/ke-750/ke-750_setup-manual_2029445027.webp)
-
24
-
10. Checking the Machine Before Tuning on the Power
Check to see if:
q
The machine is leveled.
w
The height of the board transport rail satisfies the specifications.
e
The lock nut of the adjuster is fixed.
r
Air is supplied normally.
t
The power code is connected properly, and its voltage is appropriate.
y
The supplied parts are attached properly.
u
The machine is connected to external equipment properly.
i
Each unit operates smoothly. Check the following parts manually:
1) Y-axis: Hold both edges of the X axis with both hands and move the X axis from
the front to the rear and vice versa smoothly.
2) X-axis: Hold the head bracket, and mov e it from left to right and v ice v ersa
smoothly.
3) Head: Move the Z-axis and -axis with your hands smoothly.