iii
4. ERROR CODE LIST ............................................................................................................ 93
5. MESSAGE LIST ................................................................................................................ 100
III. MAINTENANCE OF SAWING MACHINE .......................................... 103
1-1. Adjusting the height of the needle bar (Changing the length of the needle) .... 103
1-3. Adjusting the timing of main shaft and hook driving shaft ................................ 105
1-12. Changing the voltage of 100
200V ..................................................................... 109
(1) Points to be applied with JUKI Grease A ...................................................................................111
(2) Points to be applied with JUKI Grease B .................................................................................. 112
1-14. Troubles and corrective measures (Sewing conditions) ..................................... 113