Installation and operating instructions: JUDO UV disinfection system JUV 10-110 G/GS
All rights reserved.
JUDO Wasseraufbereitung GmbH
© JUDO Wasseraufbereitung GmbH
Postfach 380
D-71351 Winnenden
Translation into foreign languages and reproduction, even in excerpt form, is only permitted with special
approval.
Tel. +49 (0)7195-692-0
Fax +49 (0)7195-692-188
Revision level: 03.05.2017
E-mail: [email protected]
Internet: www.judo.eu
10
The electrical system components must be checked regularly!
Loose connections must be tightened immediately and damaged system components
immediately replaced!
UVC
Warning
Without the protective measure mentioned below, eyes can be damaged (painful eye
infection, comparable to injury caused by welding) after only a few seconds, even from a
distance of several metres. After several minutes, skin can be damaged as well by the
UVC radiation (comparable to a sunburn).
These injuries usually do not become apparent until several hours later.
Do not remove the UVC lamp from the radiation chamber or operate it outside the
radiation chamber while operating the JUDO UV disinfection system, as this may cause
severe damage to health!
To protect your eyes and facial skin from UVC radiation and glass fragments, always
wear a face shield when working at an activated JUDO UV disinfection system!
Always wear protective clothing with sufficient UV protection when working at an
activated JUDO disinfection system.
Likewise, wear cut-resistant gloves that have sufficient UV protection and protect
against cuts.
2.4.1
Safety instructions for electrical work
Warning
Switch off the power supply before working on system components; if this is ignored
severe bodily injuries or even death may result!
Wait at least 5 min. after the power supply has been disconnected before opening the
control unit (electric discharge)!
Mains voltage can still be applied to external connecting cables even if the control unit is
voltage-free!
Do not disconnect or cut off the potential equalization line and protective conductor
terminal.
All work which may possibly need to be performed while the system is live must only be
performed by qualified electricians certified according to an approved national scheme!
Switch off the power supply before working on system components and wait at least
5 min. until the electronic components have discharged!