23
To depressurise the radiation chamber and disconnect it from the pipe system, the JUDO
UV disinfection system must be fitted with shut-off valves by the customer. The shut-off valves must
be installed in such a way that they are not disabled when installing or removing the radiation
chamber.
A shut-off valve must be installed by the customer at the drain connection (JUV 35-110 G/GS).
In additional, flame-resistant sampling valves must be installed by the customer at the inlet and
outlet of the JUDO UV disinfection system.
Observe the separate installation and operating instructions of other devices and systems.
Comply with DIN EN 806, DIN EN 12056 and DIN 1988-200.
Observe technical information, local installation regulations and general guidelines (e.g. EVU, VDE,
WVU, DIN, DVGW, ÖVGW, SVGW).
Problem solutions and other installation options can be clarified by a JUDO technical consultation.