- 23 -
Note: The Startup & Shutdown of ground control station shall be implemented
according to the specifications. Press the power switch after the battery is connected.
After the system is successfully shut down, turn off the switch of power supply, the
mental switch shall be turned off.
3.2. Operations of ground control station
Step 1: uncasing operation of ground control station
Press the lower parts of clamps of case cover with both hands at the same time, and lift
the case cover after forcing the case clamps of both sides apart with the hands, which
is as shown in Figure 1.3.2.
(
Figure 3.2.1
)
Step 2: installation of data transmission/image transmission feeder line
(1): clockwise rotate and push the supportive data transmission antenna of ground
control station into the position of SMA feeder line connector labeled as "data
transmission antenna" on the panel, and have the MA feeder line connector pointed
downward and vertically and tighten it, which is as shown as Figure 3.2.2.
(2): Clockwise rotate and push two antenna extension cord of image transmission of
the ground control station into the position of SMA feeder line connector labeled as
"image transmission antenna" on the panel, and have the MA feeder line connector
pointed downward and vertically and tighten it, which is as shown as Figure 3.2.2.
Clamp
Clamp