CCRP SETTING ...................................................................................4-13
MAIN BANG SUPPRESSION SETTING ..............................................4-14
PERFORMANCE MONITOR SETTING ...............................................4-16
DATE/TIME DISPLAY SETTING ..........................................................4-18
INITIALIZATION OF SCANNER OPERATION TIME ...........................4-20
INSTALLATION OF INTERSWITCH UNIT ............................................5-1
Equipment cable end processing ............................................................ 5-1
Plug terminal block connection procedures .......................................... 5-2
Confirmation after installation ............................................................... 5-11
Inter-board connection diagram ............................................................ 5-12
INSTALLATION OF POWER CONTROL UNIT ...................................5-14
Connection with NKE-2103 type and NKE-2254-6HS type scanners .. 5-14
Connections to NKE-1125, NTG-3225, NKE-1130, and NTG-3230 ...... 5-16
Equipment cable end processing .......................................................... 5-16
End processing of each cable core ....................................................... 5-16
General system diagram of power control unit (JMA-7100) .............. 5-18
General system diagram of power control unit (JMA-9100) .............. 5-36
Inter-board connection diagram of power control unit ....................... 5-54
Exterior drawing of Power Control Unit ................................................ 5-60
INSTALLATION OF VDR .....................................................................5-62
INSTALLATION OF SUB-OPERATION UNIT AND EXPANSION OF
TRACKBALL 5-64
EXTERIOR DRAWING ...........................................................................6-1
NKE-2103-6/NKE-2103-6HS .................................................................... 6-11
Summary of Contents for JMA-7122-6XA
Page 2: ......
Page 8: ......
Page 22: ......
Page 24: ......
Page 42: ...1 18 JMA 9100 7100 Installation Manual 1 EQUIPMENT COMPOSITION 1 2 LIST OF CIRCUITS ...
Page 80: ...2 36 JMA 9100 7100 Installation Manual 2 INSTALLATION OF SCANNER UNIT 2 4 PRECAUTIONS ...
Page 128: ......
Page 222: ......
Page 224: ...6 2 JMA 9100 7100 Installation Manual 6 Appendix 6 1 EXTERIOR DRAWING Fig 6 1 NKE 1139 ...
Page 315: ......