![JRC JMA-7110-6XA Instruction Manual Download Page 123](http://html1.mh-extra.com/html/jrc/jma-7110-6xa/jma-7110-6xa_instruction-manual_2028376123.webp)
JMA-7100 Instruction Manual
>
3.BASIC OPERATION
>
3.1 OPERATION FLOW
3
-
3
3
Procedures
1)
Check that the ship
’
s mains are turned on.
2)
Press [POWER] key.
The system is turned on, and the preheating time is displayed.
is indicated at the upper left of the radar display.
3)
Wait until the preheating time is over.
When the preheating time is over, the preheating time screen disappears, and
at the upper left of the radar display changes to
.
4)
Press [TX/STBY] key.
The radar will start transmission and the antenna will start rotating.
at the upper left of the radar display changes to
.
NOTE:
The radar does not start transmission if you press [TX/STBY]
key while
is indicated.
Preheat
Preheat
Standby
Standby
Transmit
Preheat
Summary of Contents for JMA-7110-6XA
Page 2: ......
Page 19: ...xvii NQE 3141 4A 8A Interswitch Unit NQE 3167 Power Control Unit Warning Label Warning Label...
Page 26: ...xxiv Display Unit Type NCD 4790 Stand alone type Interswitch Unit Type NQE 3141 4A...
Page 44: ......
Page 46: ......
Page 48: ......
Page 84: ......
Page 120: ......
Page 250: ......
Page 334: ......
Page 350: ...6 16 JMA 7100 Instruction Manual 6 TRUE AND FALSE ECHOES ON DISPLAY 6 6 DISPLAY OF AIS SART...
Page 440: ......
Page 458: ......
Page 462: ...10 4 JMA 7100 Instruction Manual 10 DISPOSAL 10 5 ABOUT THE CHINA ROHS...
Page 488: ......
Page 545: ...JMA 7100 Instruction Manual B DRAWINGS B 8 GYRO I F B 43 B TableB 2 Gyro Log Settings...
Page 550: ...B 48 JMA 7100 Instruction Manual B DRAWINGS B 9 Inter Switch Unit...
Page 552: ......
Page 569: ...JMA 7100 Instruction Manual C Menu Index C 9 Serviceman Menu C 17 C...
Page 570: ...C 18 JMA 7100 Instruction Manual C Menu Index C 9 Serviceman Menu...
Page 571: ......