Do Žlábku 733, 514 01 Jilemnice
Subject:
MTP Technical documentation
Page No./No. of pages:
3/20
AIR HEATER COMMISSIONING PROTOCOL
TO BE FILLED IN BY A QUALIFIED WORKER OF THE ASSEMBLY COMPANY
TYPE:
MTP
Ser. No.:
Compliance with all installation conditions according
to this “MTP Technical
documentation” has been checked. Installation instructions (installation, safety distances,
connection of the air-conditioning circuit, smoke flue connection including condensate
drainage, assembly of burner and electrical installation).
In particular, connection of all thermostats has been checked:
T1 (safety)
- switches off the burner feed phase
T2 (operational)
- switches off the burner
T3 (operational)
- switches the fans and ensures their slowdown (cooling down the
heat exchanger chamber) after switching off the unit
The amount of air flowing through the heat exchanger chamber has been checked.
Overall installation (quality, completeness, craftsmanship) has been checked.
For heaters equipped with bypass, the following has been checked:
- control of valve actuators (in particular the direction of rotation)
- no valve position causes overheating of the heat exchanger and thus activation of
the operating thermostat
- there is no excessive condensation
For heaters equipped with a fan, the following has been checked:
- correct direction of rotation of the fan
- correct belt tension, if it is a belt drive
The stated heater has been installed and connected according to the “Technical
documentation” of the manufacturer a
nd is capable of continuous operation.
The commissioning and check has been carried out by:
Name: ................................ signature: .............................. date:.........................