33/116
NAVIGATION
MOORING LINES
A sufficient number of mooring lines suitably sized and suitable for the environment shall be on
board for mooring your boat.
- Always manoeuvre your boat using the engine.
- Make allowance for the current and wind when you handle your boat.
- Protect your boat to the highest degree with suitably sized fenders.
- Always keep the mooring ropes unfouled and stored away.
- Handle your boat at a reduced speed.
AFTER MOORING
- Protect the mooring lines against chafing with plastic sleeves.
- Make allowance for the variations in tides if need be.
TOWING
TOWING BOAT
- Tow another boat at a reduced speed and as smoothly as you can.
- Pay particular attention when you throw or catch the towing rope (it may foul on the
propeller).
Note: The stability may be reduced when you tow a boat.
TOWED BOAT
- Keep steering your boat and see to it that you stay in the wake of the towing boat.
- Inappropriate towing can damage your vessel, do not tow at more than 6 knots.
DANGER
Wear your life jacket.
In heavy weather, wear your safety harness and fasten yourself to the boat.
When sailing, close and lock the door or doors giving access to the transom extension..
DANGER
Don't try to stop the boat with your foot, your hand or a boat hook.
4
DECK
Summary of Contents for SUN ODYSSEY 36I
Page 1: ...SUN ODYSSEY 36I OWNER S MANUAL C ROISIERE 902651 Index J...
Page 2: ......
Page 8: ......
Page 9: ...5 116 5 1 3 5 2 ISO 10 240 SPECIFICATIONS AND WARRANTY SPECIFICATIONS YOUR BOAT 1...
Page 14: ......
Page 24: ...20 116 5 3 3 h ISO 10 240 EMERGENCY TILLER...
Page 26: ......
Page 28: ......
Page 34: ......
Page 40: ......
Page 44: ......
Page 46: ...42 116 5 3 2 ISO 10 240 STANDING RIGGING...
Page 48: ......
Page 66: ......
Page 68: ......
Page 69: ...65 116 5 3 5 4 5 5 ISO 10 240 ACCOMMODATIONS MAINTENANCE FABRICS 6...
Page 70: ...66 116 5 3 1 ISO 10 240 2 CABINS 3 CABINS...
Page 74: ......
Page 86: ......
Page 90: ......
Page 96: ......
Page 104: ...100 116 ENGINE WATER INTAKE VALVE Thru hull fitting with engine water inlet valve...
Page 110: ......
Page 111: ...107 116 5 2 5 3 5 4 ISO 10 240 LAUNCHING LAUNCHING RECOMMENDATIONS STEPPING THE MAST 10...
Page 114: ......
Page 115: ...111 116 5 3 5 4 5 5 ISO 10 240 WINTER STORAGE LAYING UP PROTECTION AND MAINTENANCE 11...
Page 118: ......
Page 120: ......