108/116
LAUNCHING RECOMMENDATIONS
A lot of skill and care is required to commission your JEANNEAU boat. The proper working of
all your boat's equipment is the result of the quality of the commissioning operations.
The initial launching and the first tests of the different equipments shall be carried out by your
JEANNEAU dealer or agent so you can expect to enjoy the warranty in case of some
equipment failure.
If later you have to launch your boat yourself, you should take the following precautions:
BEFORE LAUNCHING
- If your boat is to be fitted with sounder and speedometer, allow for the relevant fittings and
their installation.
- Check the water intake strain box for cleanliness.
- Check the engine and reduction gear oil levels (refer to engine manual).
- Turn off the engine cooling water drain valves.
- All the optional accessories shall be sealed with paste.
- Retract the speedometer into its housing (it may be damaged by the handling belts).
- For the on-line engines, check the anode at the end of the shaft is in place. Check the nut
tightening (the lock washer shall be turned over onto the nut). The anode shall not be
painted.
- Turn off all the water inlet and drain valves (sink, washbasin, heads, engine).
Summary of Contents for SUN ODYSSEY 36I
Page 1: ...SUN ODYSSEY 36I OWNER S MANUAL C ROISIERE 902651 Index J...
Page 2: ......
Page 8: ......
Page 9: ...5 116 5 1 3 5 2 ISO 10 240 SPECIFICATIONS AND WARRANTY SPECIFICATIONS YOUR BOAT 1...
Page 14: ......
Page 24: ...20 116 5 3 3 h ISO 10 240 EMERGENCY TILLER...
Page 26: ......
Page 28: ......
Page 34: ......
Page 40: ......
Page 44: ......
Page 46: ...42 116 5 3 2 ISO 10 240 STANDING RIGGING...
Page 48: ......
Page 66: ......
Page 68: ......
Page 69: ...65 116 5 3 5 4 5 5 ISO 10 240 ACCOMMODATIONS MAINTENANCE FABRICS 6...
Page 70: ...66 116 5 3 1 ISO 10 240 2 CABINS 3 CABINS...
Page 74: ......
Page 86: ......
Page 90: ......
Page 96: ......
Page 104: ...100 116 ENGINE WATER INTAKE VALVE Thru hull fitting with engine water inlet valve...
Page 110: ......
Page 111: ...107 116 5 2 5 3 5 4 ISO 10 240 LAUNCHING LAUNCHING RECOMMENDATIONS STEPPING THE MAST 10...
Page 114: ......
Page 115: ...111 116 5 3 5 4 5 5 ISO 10 240 WINTER STORAGE LAYING UP PROTECTION AND MAINTENANCE 11...
Page 118: ......
Page 120: ......