instALLAtiOn instRuctiOns (cont.)

ELEctRicAL

electrical  power  Supply:   

These  instructions  are  written 

assuming 60Hz, 120v power supply.  Special notations are 
also included for 50Hz 240v pump, control equipment, and 
power supply.

WA R N I N G

:  

v e R I F I CAT I O N   O F   e l e C T R I CA l 

R e q U I R e M e N T S   M U S T   b e   M A D e   b e F O R e 

INSTAllATION.  ReFeR  TO  The  eqUIpMeNT  lAbelS 

FOR vOlTAGe AND FReqUeNCy ReqUIReMeNTS.

NOTe: verify that the electrical service matches either the 

120v (or 240v for Signature edition) system requirements 

for this bath.

NOTe:  The  bath  is  designed  for  indoor  use  only.  The 

electrical  equipment  must  not  be  exposed  to  direct 

or  indirect  water  or  moisture  contact.  The  electrical 

equipment must also be protected from dust and other 

airborne debris before, during, and after installation.

electrical Service: 

1. 

A licensed electrician must provide 

the  “dedicated”  electrical  service  protected  by  a  GFCI. 
The  location  of  the  GFCI  must  be  at  least  five  (5)  feet 
(152  cm)  away  from  the  inside  surface  of  the  bath, 
accessible for regular testing. Use copper conductors only.

 

DANGeR  —  RISK  OF  eleCTRIC  ShOCK:  Connect 

only to a circuit protected by a Ground Fault Circuit 

Interrupter  (GFCI).  In  the  unlikely  occurrence  of 

a  current  imbalance  in  the  power  conductors, 

the  GFCI  will  interrupt  the  power  to  the  bath. 

WARNING:  The  eleCTRICAl  SeRvICe  TO  The 

GFCI  MUST  NOT  be  INTeRRUpTeD  by  ANy 

CONTROl  DevICe.  lIKeWISe,  The  eleCTRICAl 

SeRvICe FROM The GFCI TO The bATh CONTROl 

ShOUlD  be  DIReCT  AND  NOT  INTeRRUpTeD 

by  A  SWITCh.  NeveR  USe  A  SWITCh  IN 

CONJUNCTION  WITh  A  CONTROl  DevICe.  ThIS 

WIll  vOID  The  MANUFACTUReR’S  WARRANTy. 

G R O U N D I N G  

I S  

R e q U I R e D 

2. 

The  unit  should  be  installed  by  a  qualified 

service  representative  and  properly  grounded. 

I N S T A L L   S E R V I C E   C O N N E C T I O N   A T 

3. 

L E A S T   6 ”   (15 c m)   A B O V E   S U B   F L O O R . 
 

All lOCAl AND STATe eleCTRICAl AND plUMbING 

CODeS MUST be ObSeRveD.

 Where there are no local 

codes the 

National electric Code (NeC)

 and

 Uniform 

plumbing  Code  (UpC) 

shall  be  observed.  It  is  the 

responsibility of the installer/owner to determine specific 
code  compliance  prior  to  installation  of  the  product. 

NOTe:

 In the Commonwealth of Massachusetts, installation 

is to be done by a Massachusetts licensed plumber.

Standard/premier  edition  Control  box  (120v).

4. 

  The 

pump is prewired to a control box. The control box has a 
36” (91cm) cord with plug end. If a Jetted Neck Pillow is 
installed an additional control box will be included. The 
control box(es) are mounted on a stand that is temporarily 
secured to the packing board for shipping. These boxes 
must remain on the control box bracket so that the two 
boxes  can  communicate  properly  through  their  infrared 
communication  feature.  During  installation,  the  control 
box bracket and controls must be positioned horizontally 
and located to permit access for inspection and servicing. 
The pump control box must be plugged into a dedicated 
120v (volt), 20A (amp), 60Hz (hertz), Ground Fault Circuit 
Interrupter (GFCI) protected circuit. 

(See Figure 4)

Standard/premier  edition  Control  box  (240v).

5. 

  The 

pump is prewired to the control box. The control box has 
a 36 inch [91 cm] cord with a junction box connection. If 
a Jetted Neck Pillow is installed an additional control box 
will  be  included.  The  control  box(es)  are  mounted  on  a 
stand that is temporarily secured to the packing board for 
shipping.  These  boxes  must  remain  on  the  control  box 
bracket so that the two boxes can communicate properly 
through  their  infrared  communication  feature.  During 
installation,  the  control  box  stand  and  controls  must  be 
positioned horizontally and located to permit access for 
inspection and servicing. The pump control box must be 
connected into a dedicated 240v 20A, 50 or 60 Hz, GFCI 
protected circuit.

 (See Figure 4)

Signature edition Control box.

6. 

 The pump is prewired to 

the control box. The control box has a 36 inch [91 cm] cord 
with a junction box connection. The control box is mounted 
on a stand that is temporarily secured to the packing board 
for  shipping.  During  installation,  the  control  box  stand 
and controls must be positioned horizontally and located 
to permit access for inspection and servicing. The pump 
junction  box  must  be  connected  into  a  dedicated  240v 
20A, 50 or 60 Hz, GFCI protected circuit.

 (See Figure 4A) 

For  the  LS640,  the  junction  box  for  the  pumps 
must  be  connected  into  a  dedicated  240v,  20A, 
60Hz,  GFCI  protected  circuit. 

(See  Figure  4b) 

DANGeR:  Do  not  alter  the  factory  installed  wiring.  All 

building materials and wiring should be routed away from 

the  equipment  or  other  heat-producing  components  of 

the unit.

Summary of Contents for CC550

Page 1: ...sponsibility Damage sustained in transit is the responsibility of the carrier If damage is discovered If the carton shows sign of damage inspect the product before accepting and describe the problem on the Bill of Lading the carrier must be immediately notified in writing with a request for a representative to inspect the unit Failure of the carrier to respond should be reported to the seller and ...

Page 2: ...0 55 x 55 x 20 5 59 36 x 17 in 54 1 140 x 140 x 52 223 91 x 43 cm 264 60 x 32 x 20 5 36 36 x 17 in 52 1 152 x 81 x 52 136 91 x 43 cm 254 60 x 36 x 20 5 44 36 x 17 in 56 6 152 x 91 x 52 167 91 x 43 cm 276 60 x 42 x 20 5 49 36 x 17 in 48 1 152 x 107 x 52 185 91 x 43 cm 235 72 x 42 x 20 5 52 36 x 17 in 46 4 183 x 107 x 52 197 91 x 43 cm 227 60 x 32 x 20 5 32 36 x 17 in 50 5 152 x 81 x 52 121 91 x 43 ...

Page 3: ... 91 x 43 cm 274 72 x 42 x 25 66 36 x 17 in 51 4 183 x 107 x 64 250 91 x 43 cm 251 72 x 48 x 23 100 36 x 17 in 60 8 183 x 122 x 58 379 91 x 43 cm 297 66 x 36 x 25 52 36 x 17 in 60 5 168 x 91 x 64 197 91 x 43 cm 295 72 x 42 x 25 66 36 x 17 in 56 183 x 107 x 64 250 91 x 43 cm 273 60 x 36 x 20 5 40 36 x 17 in 49 4 152 x 91 x 52 151 91 x 43 cm 241 72 x 48 x 20 5 53 36 x 17 in 46 9 183 x 122 x 52 201 91...

Page 4: ...rt is to be used the bath deck must be leveled at 20 5 52cm from the support floor or the skirt will not fit properly 100 Silicone with mildew resistant properties should 2 be applied between the water resistant backer board and the deck of the bath NOTE If you use a tile flange kit modify the framing to support the bath lip as shown in Figure 1 Install the drain and overflow assembly to the bath ...

Page 5: ... 8 is level with the bottom of the bath Position the bath in the area of intended installation and cut the equipment supportstrap s toallowtheequipmenttorestfirmlyonthe floor We recommend securing the equipment mounts to the floor with removable fasteners for ease of servicing Protect the acrylic bath surface from damage during 9 installation with a suitable material i e cardboard and or plastic f...

Page 6: ...the Commonwealth of Massachusetts installation is to be done by a Massachusetts licensed plumber Standard Premier Edition Control Box 120v 4 The pump is prewired to a control box The control box has a 36 91cm cord with plug end If a Jetted Neck Pillow is installed an additional control box will be included The control box es are mounted on a stand that is temporarily secured to the packing board f...

Page 7: ...uipment ground and should be connected to the neutral bus found in the main breaker box Figure 4 Figure 4A Figure 4B L2 WHITE WITH RED MARK L1 BLACK GND GREEN FROM HEATER FROM CONTROL S L2 240 V L1 NO CONNECTION LOAD NEUTRAL BREAKER BOX Note The load neutral terminal is not used There should be no connection to the load neutral terminal on the GFCI circuit breaker The green wire GND GREEN is the e...

Page 8: ... acrylic surface during installation to minimize cleanup and prevent surface damage WATER TESTING Before finishing the installation it is recommended that the bath be water tested and the plumbing tested for leaks Before water testing the bath 1 make sure any pump unions are hand tight Do not over tighten or use a pipe wrench This will damage the unions and cause leaking If the unit leaks with the...

Page 9: ...ndard Edition system and includes the benefits of a combination pump heater ozone sanitation system and an LED Chromatherapy light To assure that your bath functions properly the pump control box must be properly connected NOTE For 120v systems the power cord for the Whirlpool control box must be plugged into a 120v 20 amp GFCI dedicated circuit THE PUMP CONTROL BOX The Pump keypad and Water Level...

Page 10: ...orrect operation of the Whirlpool system See Figure 7 for connections A The junction box for the pump control boxes and heater must be connected into a 240v 20 amp GFCI dedicated circuit B Pre wired power cords to pump C and ozone unit E Eight pin mini DIN terminal for installation of Whirlpool keypad F Six pin mini DIN terminals for the water temperature sensor D and LED light G to the pump contr...

Page 11: ...or installation of the water sensor to the pump control box E 8 pin mini DIN terminal for the Whirlpool keypad Jason s Premier Edition Whirlpool system incorporates all the features of the Standard Edition system and includes the benefits of a combination pump heater ozone sanitation system and an LED Chromatherapy light To assure that your bath functions properly the pump control box must be prop...

Page 12: ...ntrol box must be properly connected for the bath to function correctly THE PUMP CONTROL BOX The Pumps Ozone Keypad LED Light and Water Level Sensor must be plugged into the proper receptacles for cor rect operation of the Whirlpool system See Figure 7A for connections A The junction box for the pump control boxes and heater must be connected into a 240v 20 amp GFCI dedicated circuit B Pre wired p...

Page 13: ... addition to the main control touchpad installed on the bath deck a floating waterproof Universal Remote Control is provided with all Signature Edition Whirlpool baths This remote control provides the same control functions as the bath s main control console plus the bather may remotely operate a TV DVD VCR CD etc Refer to the Instruction Manual provided with the remote control for detailed instru...

Page 14: ...ATURES AND CONTROLS cont OPERATING INSTRUCTIONS Whirlpool Icon The Pump icon is used to activate the whirlpool pump and the 20 minute timer Pressing the icon the first time starts the pump Pressing the icon again will shut the pump off O Option Whirlpool Option The Option icon is used to operate an LED light if in stalled Press the icon for less than two 2 seconds to turn the lights Off or On Hold...

Page 15: ...a waterproof floating Universal Remote Control It controls all bath functions plus a TV DVD CD etc which can be heard through the Sound Immersion Transducers optional OPERATING INSTRUCTIONS FEATURES AND CONTROLS cont OPERATING INSTRUCTIONS Whirlpool On Off Icon To control the operation of the whirlpool pump motor press and release for each setting High Medium Low or Off For 50Hz controls ON or OFF...

Page 16: ...erial number can be found on the front page of this manual or on the small card adhered to the back of the bath just above the equipment HUMIDITY Warning Avoid high humidity levels in your home Mold mildew fungi and bacteria which maybeharmfultohealththriveinareaswith continued high humidity levels therefore every precaution should be taken to make sure your plumbing fixtures including bathtubs th...

Page 17: ...ary Pump operates but no air is injected into water a Air valves are closed a Open air control valves b Airl line is clogged b Refer to installer dealer Pump operates but water is not being pumped a Suction or discharge blocked a Remove obstruction b Suction air leak System usually surges b Make sure union is tight on suction side of the purmp Pump does not manually shutoff a Defective keypad or c...

Page 18: ... vasoconstrictors vasodilators hypnotics narcotics or tranquilizers F Persons with a medical history of heart disease low or high blood pressure circulatory system problems or diabetes should consult a physician before using a therapy bath G Personsusingmedicationshouldconsultaphysicianbeforeusingatherapybathsincesomemedicationmayinducedrowsiness while other medication may affect heart rate blood ...

Reviews: