8
PROGRAMMING
INSTRUCTIONS
FOR CHEMICAL
FEEDER PUMPS
(INSTALLATION
TECHNICIAN ONLY)
The chemical feeder pump timers are located on screens 3, 4 & 5. To access the
programming mode follow the process detailed below.
INSTRUCTIONS
INSTALLATION
1. Press “A” to cycle
through screens until
reaching the "Fill Cycle
Timers" screen (#3).
2. Press “+” or “-” to
highlight the timer in need
of adjustment and press
“OK” to enter edit mode
for that timer.
3. Press “+” or “-” to make
needed adjustments and
press “OK” to confirm.
4. Press “A” and continue
to the “Wash Cycle Timers”
screen (#4). Follow steps
2 & 3 to confirm any
adjustments.
5. Press “A” and continue
to the “Wash Cycle Timers”
screen (#5). Follow steps
2 & 3 to confirm any
adjustments.
6. Press “A” & “B”
simultaneously to return
to the home screen (#1).
Run the machine through
several cycles to
verify changes.
Fill CYCLE TIMERS:
Fill Timer:
s
Det Timer:
R/A Timer: 0012.0s
s
Millenium 3
Crouzet
0010.0
WASH CYCLE TIMERS:
Det Timer:
R/A Timer: 00008s
San Time:
s
Millenium 3
Crouzet
0005.0
s
00008
WASH CYCLE TIMERS:
Wash Time:
00075s
Rinse Time:
Drain Time: 00008s
s
Millenium 3
Crouzet
Summary of Contents for AVENGER HT-E
Page 2: ......
Page 35: ...29 CONTROL PANEL PARTS 1 8 3 2 4 5 6 7 ...
Page 41: ...35 115V CONTROL BOX PARTS ITE 2 3 4 5 6 7 8 9 13 14 15 4 4 2 5 6 8 9 7 3 1 1 ...
Page 46: ...40 WASH DRAIN MOTOR ASSEMBLY PARTS 10 11 12 13 1 2 3 4 5 9 8 6 7 ...
Page 54: ...48 RINSE TANK ASSEMBLY PARTS 8 7 6 5 2 3 4 1 ...
Page 58: ...52 SCHEMATICS 115 VOLT ELECTRICAL DIAGRAM ...
Page 59: ...53 SCHEMATICS 208 230 VOLT ELECTRICAL DIAGRAM ...