Before installing unit, check container and machine for damage. A damaged container
may be an indication of damage to the machine. If there is any type of damage to
both container and unit, do not throw away the container. The dishmachine has
been inspected at the factory prior to shipping and is expected to arrive in new,
undamaged condition. However, rough handling by carriers or others may result in
damage to the unit while it is in transit. If such a situation occurs, do not return the
unit to the manufacturer. Instead, contact the carrier and ask them to send a
representative to the site to inspect the damage, and request that an inspection
report be completed.
Contact the carrier within 48 hours of receiving the machine (to report possible
freight damage) and the dealer from whom the unit was purchased.
The machine should be unboxed and removed from the pallet prior to installing. Open
the front door and remove all of the materials from the inside. Once unpacked, verify
there are no missing parts. If a part is missing, contact manufacturer immediately.
The dishmachine is designed to operate while level. This is important to prevent any
damage to the machine during operation and to ensure the best results possible.
The unit comes equipped with adjustable bullet feet which can be turned using a
pair of pliers. Verify the unit is level from front to back and side to side before
making any electrical or plumbing connections.
All plumbing connections must be made to adhere to local, state, territorial and
national codes. The installing plumber is responsible for ensuring the incoming
water lines are flushed of debris prior to connecting to the machine. Note that chips
and materials from cutting processes can become lodged in the solenoid valves
and prevent them from opening or closing. Any valves that are found to be fouled or
defective because of foreign matter left in the water line, and any subsequent water
damage, are not the responsibility of the manufacturer.
A water hardness test must be performed to determine if the HTS-11 (scale
prevention & corrosion control) needs to be installed. A hardness test kit can be
found on the warning tag that is attached to the incoming plumbing connection on
the back of the machine. If water hardness is higher than 5 GPG, the HTS-11 will
need to be installed. Please contact manufacturer to purchase the HTS-11.
INSTRUCTIONS
INSTALLATION
VISUAL INSPECTION
DO NOT THROW AWAY
CONTAINER IF DAMAGE
IS EVIDENT
LEVEL THE
DISHMACHINE
UNPACKING THE
MACHINE
PLUMBING THE
DISHMACHINE
A water hardness test
must be performed.
Summary of Contents for AVENGER HT-E
Page 2: ......
Page 35: ...29 CONTROL PANEL PARTS 1 8 3 2 4 5 6 7 ...
Page 41: ...35 115V CONTROL BOX PARTS ITE 2 3 4 5 6 7 8 9 13 14 15 4 4 2 5 6 8 9 7 3 1 1 ...
Page 46: ...40 WASH DRAIN MOTOR ASSEMBLY PARTS 10 11 12 13 1 2 3 4 5 9 8 6 7 ...
Page 54: ...48 RINSE TANK ASSEMBLY PARTS 8 7 6 5 2 3 4 1 ...
Page 58: ...52 SCHEMATICS 115 VOLT ELECTRICAL DIAGRAM ...
Page 59: ...53 SCHEMATICS 208 230 VOLT ELECTRICAL DIAGRAM ...