inoMIG 350/400
Operating manual
Page 43
29. Operation / welding
- Installation of the welding unit
When installing the machine, allow for sufficient space for inlet and outlet cooling air so that the rated duty cycle
will be attained.
The machine should not be exposed to moisture, welding spatter or spark rays caused by grinding work.
- Mains connection (if not mounted)
To be carried out only by a qualified electrician!
Connect mains plug to mains cable as specified on the rating plate. The yellow-green lead is provided for PE
earth conductor. The three phases (black, brown, blue) may be con-nected to L1, L2, and L3 at random.
MIG / MAG welding
Connection of the MIG/MAG Torch
Connect the welding to the central connection socket, the water connections and maybe the up/down cable.
Observe the colours of the water connections.
Pin assignment of the up / down port, see the schematic.
Connection of shielding gas cylinder
Put the Gas cylinder at the back of the bottle cart and secure it with the chains. Connect cylinder pressure
reducer and check that all connections are tightly sealed. Set the shielding gas flow rate at the pressure reducer
on cylinder (6- 18 l/min). The gas flow rate depends chiefly on the welding amperage.
Connection of work piece cable
When clamping the work piece into its holder, choose an appropriate spot without paint or rust for good
conductivity.
Starting the welding process
Set the MC control box to the MIG/MAG mode, adjust the parameters for the welding job and start welding
process by pressing the torch trigger