Driver - for installation instructions refer to
4.10 Install a solid-shaft driver on page 34
and Instal-
ling a hollow-shaft driverThis topic describes how to install a hollow-shaft driver..
•
Packing - for assembly instructions refer to
4.7 Stuffing box installation on page 27
•
Mechanical seal with piping - for assembly instructions refer to
4.8 Mechanical seal options on page
•
Coupling assembly, spacer or non-spacer type
Refer to the Certified Pump Outline Drawing for the location of the anchor-bolt holes.
1.
If a sub-base is supplied, install it.
2.
Clean the sub-base and the bottom of the discharge head base.
3.
Attach suitable lifting devices to the discharge head lifting lugs or the hoist rings in the mounting
flange. Make sure that the shackles, eye bolts, and sling are rated to handle in excess of the pump
weight. Attach suitable lifting sling around suction bell. Lift pump assembly from horizontal position
with two separate crane hooks. See the outline drawing.
4.
Hoist the unit into position over the foundation.
5.
Carefully guide the unit so that it does not strike the sides of the sub-base or foundation.
6.
Lower the unit until the discharge-head flange engages and rests firmly on the sub-base surface,
then secure it with the capscrews provided.
4.4 Installing the bowl assembly, Install unassembled pump
elements
WARNING:
Avoid working under suspended loads. If necessary to do so, follow the more stringent of local,
state or federal safety regulations.
CAUTION:
Refer to
2.3.1 Lifting methods on page 11
Pump may need to be assembled in a horizontal or vertical position depending on site conditions. Refer
to assembly and erection drawing in appendix for specific instructions.
1.
Check that all fasteners are tight and turn the pump shaft by hand to make sure it turns freely.
2.
Remove all accumulated dust, oil, or other foreign material from the external surfaces.
3.
Place two I-beam supports across the barrel opening that are strong enough to safely support the
weight of the entire pump assembly.
NOTICE:
I-beams and lifting clamps can be provided by ITT upon request. If I-beams and lifting clamps
are supplied by ITT the "Pump Installation Instructions (w/ Lifting Clamps)" IOM should be
used.
Connect these I-beams with threaded rods and nuts so you can clamp them firmly together for the
portion to be supported.
4.4 Installing the bowl assembly, Install unassembled pump elements
Model VCW Installation, Operation, and Maintenance
23