1.
Lower impeller
2.
Raise impeller
3.
Correct impeller rotation
4.
Insert a capscrew into hole B provided that these are the nearest-matching holes for counterclock-
wise rotation of the adjusting nut.
4.11 Installation and startup checklist
Use this checklist in conjunction with the standard instruction manual furnished with the equipment. Initial
each completed item or write N/A if the item is not applicable. After you complete this checklist, forward a
copy to the VPD field service for entry into the quality assurance records. Use a separate checklist for
each individual pump.
Part 1: System and installation inspections
Check
Checked
Check that the pump foundation is level to within 0.0123 cm per m | 0.005 in. per ft. of diameter. For
API units, the level requirement is 0.003 cm per m | 0.001 in. per ft. of diameter.
Check that the foundation can handle the weight and loading of the pump.
Check that the foundation is properly grouted using a high quality non-shrink grout.
Check that all the anchor bolts are tight.
Check that the suction and discharge piping is properly supported and that there is no excess nozzle
loading on the discharge flange.
On units with flexible or expansion joints attached to the pump suction or discharge, check that tie
rods are in place and properly installed.
Check that the suction valve is fully open.
Check these items for all valves:
•
Operate freely
•
Properly installed for the direction of flow
4.11 Installation and startup checklist
42
Model VCW Installation, Operation, and Maintenance