DISCHARGE PIPING
1.
Isolation and check valves should be installed in
discharge line. Locate the check valve between
isolation valve and pump, this will permit inspection of
the check valve. The isolation valve is required for
priming, regulation of flow, and for inspection and
maintenance of pump. The check valve prevents pump
or seal damage due to reverse flow through the pump
when the driver is turned off.
2.
Increasers, if used, should be placed between pump
and check valves.
3.
Cushioning devices should be used to protect the
pump from surges and water hammer, if quick-closing
valves are installed in system.
FINAL PIPING CHECK
After Connecting Piping to the Pump
!
Rotate shaft by hand to ensure it rotates smoothly
and there is no rubbing which could lead to excess
heat generation and or sparks.
1.
Rotate shaft several times by hand to be sure that there
is no binding and all parts are free.
2.
Check alignment, per the alignment procedure outlined
previously to determine absence of pipe strain. If pipe
strain exists, correct piping.
!
A build up of gases within the pump, sealing system
and or process piping system may result in an
explosive environment within the pump or process
piping system. Ensure process piping system, pump
and sealing system are properly vented prior to
operation.
3298 Family Rev. 4/07
25
Fig. 29
INCORRECT PIPING
Fig. 30
CORRECT PIPING
3
Summary of Contents for Goulds Pumps V 3298
Page 6: ...6 3298 Family Rev 4 07 ...
Page 26: ...26 3298 Family Rev 4 07 ...
Page 32: ...32 3298 Family Rev 4 07 ...
Page 38: ...38 3298 Family Rev 4 07 ...
Page 112: ...112 3298 Family Rev 4 07 ...
Page 115: ...3298 Family Rev 4 07 115 7 ...
Page 116: ...INTERCHANGEABILITY 3298 XS GROUP 116 3298 Family Rev 4 07 ...
Page 117: ...INTERCHANGEABILITY 3298 S GROUP 3298 Family Rev 4 07 117 7 ...
Page 119: ...INTERCHANGEABILITY 3298 L GROUP 3298 Family Rev 4 07 119 7 ...
Page 120: ...INTERCHANGEABILITY SP 3298 S GROUP 120 3298 Family Rev 4 07 ...
Page 121: ...INTERCHANGEABILITY V 3298 S GROUP 3298 Family Rev 4 07 121 7 ...
Page 122: ...INTERCHANGEABILITY V 3298 M GROUP 122 3298 Family Rev 4 07 ...
Page 124: ...124 3298 Family Rev 4 07 ...
Page 125: ...APPENDIX I 3298 HYDRAULIC COVERAGE CHARTS 3298 Family Rev 4 07 125 8 ...
Page 126: ...3298 HYDRAULIC COVERAGE CHARTS 126 3298 Family Rev 4 07 ...
Page 127: ...SP 3298 HYDRAULIC COVERAGE CHARTS 3298 Family Rev 4 07 127 8 ...
Page 128: ...SP 3298 HYDRAULIC COVERAGE CHARTS 128 3298 Family Rev 4 07 ...
Page 129: ...V 3298 HYDRAULIC COVERAGE CHARTS 3298 Family Rev 4 07 129 8 ...
Page 130: ...V 3298 HYDRAULIC COVERAGE CHARTS 130 3298 Family Rev 4 07 ...
Page 134: ...134 3298 Family Rev 4 07 ...
Page 136: ...IMPELLER TRIM PROCEDURE 136 3298 Family Rev 4 07 Fig III 2 Group S M Fig III 3 Group L ...
Page 142: ...142 3298 Family Rev 4 07 ...