ALIGNMENT TROUBLESHOOTING
NOTE: With experience, the installer will understand
the interaction between angular and parallel and will
make corrections appropriately.
GROUT BASEPLATE
1.
Clean areas of baseplate that will contact grout. Do not
use an oil-based cleaner because grout will not bond to it.
2.
Build a dam around foundation (Fig. 22). Thoroughly
wet foundation.
3.
Pour grout through grout hole in baseplate up to level of
dam. Remove air bubbles from grout as it is poured by
puddling, using a vibrator, or pumping the grout into
place. Non-shrink grout is recommended (Fig. 22).
4.
Allow grout to set.
5.
Fill remainder of baseplate with grout. Remove air as
before (Fig. 23).
6.
Allow grout to set at least 48 hours.
7.
Tighten foundation bolts.
ALIGNMENT CHECK
Re-check alignment before continuing, using methods
previously described.
22
3298 Family Rev. 4/07
Table 3
Alignment Troubleshooting
PROBLEM
PROBABLE CAUSE
REMEDY
Cannot obtain horizontal (Side-to-Side)
alignment, angular or parallel.
Driver feet bolt bound.
Loosen pump hold down bolts and slide pump and driver
until horizontal alignment is achieved.
Cannot obtain vertical (Top to Bottom)
alignment, angular or parallel.
Baseplate not leveled properly,
probably bowed.
Determine if center of baseplate should be raised or
lowered and correct by evenly adding or removing shims
at the center of the baseplate.
Fig. 22
Fig. 23
Summary of Contents for Goulds Pumps V 3298
Page 6: ...6 3298 Family Rev 4 07 ...
Page 26: ...26 3298 Family Rev 4 07 ...
Page 32: ...32 3298 Family Rev 4 07 ...
Page 38: ...38 3298 Family Rev 4 07 ...
Page 112: ...112 3298 Family Rev 4 07 ...
Page 115: ...3298 Family Rev 4 07 115 7 ...
Page 116: ...INTERCHANGEABILITY 3298 XS GROUP 116 3298 Family Rev 4 07 ...
Page 117: ...INTERCHANGEABILITY 3298 S GROUP 3298 Family Rev 4 07 117 7 ...
Page 119: ...INTERCHANGEABILITY 3298 L GROUP 3298 Family Rev 4 07 119 7 ...
Page 120: ...INTERCHANGEABILITY SP 3298 S GROUP 120 3298 Family Rev 4 07 ...
Page 121: ...INTERCHANGEABILITY V 3298 S GROUP 3298 Family Rev 4 07 121 7 ...
Page 122: ...INTERCHANGEABILITY V 3298 M GROUP 122 3298 Family Rev 4 07 ...
Page 124: ...124 3298 Family Rev 4 07 ...
Page 125: ...APPENDIX I 3298 HYDRAULIC COVERAGE CHARTS 3298 Family Rev 4 07 125 8 ...
Page 126: ...3298 HYDRAULIC COVERAGE CHARTS 126 3298 Family Rev 4 07 ...
Page 127: ...SP 3298 HYDRAULIC COVERAGE CHARTS 3298 Family Rev 4 07 127 8 ...
Page 128: ...SP 3298 HYDRAULIC COVERAGE CHARTS 128 3298 Family Rev 4 07 ...
Page 129: ...V 3298 HYDRAULIC COVERAGE CHARTS 3298 Family Rev 4 07 129 8 ...
Page 130: ...V 3298 HYDRAULIC COVERAGE CHARTS 130 3298 Family Rev 4 07 ...
Page 134: ...134 3298 Family Rev 4 07 ...
Page 136: ...IMPELLER TRIM PROCEDURE 136 3298 Family Rev 4 07 Fig III 2 Group S M Fig III 3 Group L ...
Page 142: ...142 3298 Family Rev 4 07 ...