RETURN OF MATERIALS
If it is necessary to return the pump to a Goulds factory or
repair facility for service, certain procedures must be
followed.
Do not return any parts without authorization from the
warranty engineer, a warranty claim number, and the
preprinted shipping label supplied by Goulds. In rare
instances because of the pumpage, ITT Goulds Pumps
Warranty Services may, at their option, decide not to have
the parts returned.
The parts being returned must be decontaminated prior to
shipment. The decontamination must be verified in
writing. The correct Material Safety Data Sheet (MSDS)
must accompany the parts along with decontamination
"sign off." This information is stated within the ITT
Goulds Pumps "decontamination procedure." The
Warranty Service engineer will send a copy of this
procedure to the customer. Please remember that
inspection of the parts cannot be started until we receive
the proper documentation. This is a safety and legal issue
and consequently strict adherence to procedure is
mandatory — there will be no exceptions.
Before shipping, check with your carrier for special
procedures that may be required when shipping highly
magnetic materials.
All pumps must be decontaminated prior to return. Refer
to
Preparation for Disassembly
and
Decontamination
Procedure
.
3298 Family Rev. 4/07
123
7
Summary of Contents for Goulds Pumps V 3298
Page 6: ...6 3298 Family Rev 4 07 ...
Page 26: ...26 3298 Family Rev 4 07 ...
Page 32: ...32 3298 Family Rev 4 07 ...
Page 38: ...38 3298 Family Rev 4 07 ...
Page 112: ...112 3298 Family Rev 4 07 ...
Page 115: ...3298 Family Rev 4 07 115 7 ...
Page 116: ...INTERCHANGEABILITY 3298 XS GROUP 116 3298 Family Rev 4 07 ...
Page 117: ...INTERCHANGEABILITY 3298 S GROUP 3298 Family Rev 4 07 117 7 ...
Page 119: ...INTERCHANGEABILITY 3298 L GROUP 3298 Family Rev 4 07 119 7 ...
Page 120: ...INTERCHANGEABILITY SP 3298 S GROUP 120 3298 Family Rev 4 07 ...
Page 121: ...INTERCHANGEABILITY V 3298 S GROUP 3298 Family Rev 4 07 121 7 ...
Page 122: ...INTERCHANGEABILITY V 3298 M GROUP 122 3298 Family Rev 4 07 ...
Page 124: ...124 3298 Family Rev 4 07 ...
Page 125: ...APPENDIX I 3298 HYDRAULIC COVERAGE CHARTS 3298 Family Rev 4 07 125 8 ...
Page 126: ...3298 HYDRAULIC COVERAGE CHARTS 126 3298 Family Rev 4 07 ...
Page 127: ...SP 3298 HYDRAULIC COVERAGE CHARTS 3298 Family Rev 4 07 127 8 ...
Page 128: ...SP 3298 HYDRAULIC COVERAGE CHARTS 128 3298 Family Rev 4 07 ...
Page 129: ...V 3298 HYDRAULIC COVERAGE CHARTS 3298 Family Rev 4 07 129 8 ...
Page 130: ...V 3298 HYDRAULIC COVERAGE CHARTS 130 3298 Family Rev 4 07 ...
Page 134: ...134 3298 Family Rev 4 07 ...
Page 136: ...IMPELLER TRIM PROCEDURE 136 3298 Family Rev 4 07 Fig III 2 Group S M Fig III 3 Group L ...
Page 142: ...142 3298 Family Rev 4 07 ...