18
Note
Report damage and/or missing parts to your point of sale.
2.14. Scope of delivery
1
2
3
4
Legend
1
Ventilation unit*
2
Power cable
3
Wall bracket set
4
Documentation
* The ventilation unit is put into operation with an app.
2.15. Unpacking and checking
a) Carefully take the equipment out of the box.
b) Check the nameplate details and type for correctness as shown
on the sticker on the outside of the box.
c) Check the equipment for damage and completeness.
d) Check that the necessary documentation and accessories
are packed with the appliance.
e) Place the ventilation unit upright on the ground.
Summary of Contents for HRU 400
Page 1: ...Itho Daalderop HRU 400 Installation use A...
Page 2: ...Original document...