Italian Gelato CETEAM 1927 STARGEL 12 Instruction Handbook Manual Download Page 7

STARGEL

Stargel - 2018/04 - rev. 03

- 7 -

EN

SAFETY

When using the machine, one must be aware of the fact that drive mechanisms (rotary motion), 

high voltage components, as well as parts subject to high temperatures may cause serious damage 

to persons and things.

Persons in charge of plant safety must make sure that:

  any incorrect use or handling is avoided;

 

safety devices are not removed or tampered with;

 

the machine is regularly serviced;

 

only original spare parts are used especially as far as those components with safety functions 

are concerned (ex.: protection microswitches, thermostats);

 

suitable personal protective equipment is worn;

 

attention is paid during hot product cycling.   

To achieve the above, the following is necessary:

   at the work station an instruction manual relevant to the machine should be available;

  such documentation must be carefully read and requirements must consequently be met;

  The appliance is only to be installed in locations where its use and maintenance is restricted 

to trained personnel.

 

only adequately skilled personnel should be assigned to electrical equipment; this appliance is 

not intended for use by persons (including children) with reduced physical, sensory or mental  

capabilities, or lack of experience and knowledge, unless they have been given supervision or 

instruction concerning use of the appliance by a person responsible for their safety;

   Make sure that no technician will ever carry out interventions outside his own knowledge and 

responsibility sphere;

   Children should be supervised to ensure that they do not play with the appliance.

IMPORTANT!

Make sure that the staff does not carry out any operation outside their own sphere of knowledge 

and responsibility (refer to “Symbology qualification of the staff”).

NOTE:

According to the standard in force, a QUALIFIED ENGINEER is a person who, thanks to:

- training, experience and education,

- knowledge of rules, prescriptions and interventions on accident prevention,

- knowledge of machine operating conditions, 

is able to recognise and avoid any danger and who has also been allowed by the person in charge 

of plant safety to carry out all kinds of interventions.

 

WARNINGS

•  Never put your hand into the machine, alike during production and cleaning operations. 

Before carrying out any maintenance operation, make sure that the machine is in “

STOP

” 

position and main switch has been cut out.

•  It is forbidden to wash the machine by means of a bolt of water under pressure.

•  It is forbidden to remove panels in order to reach the machine inside before having discon

-

nected the machine.

•  The place of installation must not be exposed to water sprays, high moisture, heat or steam sources.

•  Do not store explosive substances or spray bottles inside the machine, nor bottles for 

aerosol with flammable propellants.

• 

ICETEAM 1927

 is not responsible for any accident that might happen during operation, 

cleaning and/or servicing of its units, if this warning has not been fully complied with.

Summary of Contents for CETEAM 1927 STARGEL 12

Page 1: ...RGEL 8 STARGEL 12 Code IC193 008532_03 Italian Gelato Concepts Pty Limited Unit 1 37 Mortimer Road Acacia Ridge Qld 4110 Bris Office 61 0 7 3162 7724 Syd Office 61 0 2 8311 9701 Email info italiangela...

Page 2: ...ents to the purchaser We wish to thank you for the preference granted to us by purchasing one of ICETEAM 1927 machines To the best guarantee since 1993 ICETEAM 1927 has submitted its own Quality Syste...

Page 3: ...S 11 1 7 WEEE Waste Electrical and Electronic Equipment 12 SEC 2 INSTALLATION 2 1 ROOM NECESSARY TO THE MACHINE USE 13 2 2 WATER SUPPLY CONNECTION 13 2 3 MACHINES WITH AIRCOOLED CONDENSER 13 2 4 MACHI...

Page 4: ...ANITIZER 24 5 5 OUTSIDE CLEANOUT 24 5 6 PRELIMINARY CLEANOUT 24 5 7 BEATER DISASSEMBLY 24 5 7 1 STUFFING BOX 25 5 8 FRONT LID DISASSEMBLY 25 5 8 1 ICE CREAM DOOR DISASSEMBLY 26 5 8 2 HOPPER COVER DISA...

Page 5: ...ction is the part of the handbook identifying a specific topic related to a machine part Chapter A chapter is that part of a section describing an assembly or concept relevant to a machine part Subcha...

Page 6: ...that the operator must use personal protection against an implicit risk of accident EQUIPOTENTIAL CONNECTION For connecting all appliances with this type of connection Warning do not connect to ground...

Page 7: ...ety Make sure that no technician will ever carry out interventions outside his own knowledge and responsibility sphere Children should be supervised to ensure that they do not play with the appliance...

Page 8: ...STARGEL Stargel 2018 04 rev 03 8 EN...

Page 9: ...le for any clarification and information about its operation In case of need please call the local distributor or the manufacturer if no distributor is available in the country of the user The manufac...

Page 10: ...before serving it and start selling it only if entirely satisfactory Make sure your staff always keeps the machine clean Have your machine serviced always by companies authorized by ICETEAM 1927 Othe...

Page 11: ...on proof laws its use is thus bound to complying rooms and normal atmosphere 1 4 NOISE The steady acoustic pressure level weighed A in a working place alike by watercooled and by aircooled machines is...

Page 12: ...e disposed of with normal urban waste Instead it is the user s responsibility to dispose of this product by returning it to a collection point designated for the recycling of electrical and electronic...

Page 13: ...low free air circulation around the condenser NOTE An insufficient air circulation affects operation and output capacity of the machine 2 2 WATER SUPPLY CONNECTION The machine must be connected to run...

Page 14: ...ical installation by competent and qualified technical personnel meeting the technical and professional require ments provided for by the legislation in force in the country of installation Before con...

Page 15: ...lling necessary to the freezing system is carried out at ICETEAM 1927 works during machine postproduction testing If a gas addition happens to be made this must be carried out by skilled technicians o...

Page 16: ...STARGEL Stargel 2018 04 rev 03 16 EN...

Page 17: ...e working place an instruction manual relevant to the machine should be available such documentation must be carefully read and requirements must consequently be met only adequately skilled personnel...

Page 18: ...to start the cycle or wait 5 seconds ICE CREAM AND FRUIT CYCLE The product is cooled in the cylinder until Hot consistency is reached On the basis of the chosen Ice Cream or Fruit cycle an opportune H...

Page 19: ...n mode INCREMENT This key increases those values that can be modified both in Programming and in the values where allowed DECREMENT This key decreases those values that can be modified both in Program...

Page 20: ...e knob to the front and pull i it rightwards Closing Close the lid push the knob leftwards and lower 3 4 1 Ice cream distribution When the production program is completed ice cream will be taken out f...

Page 21: ...the alarm is active Alarm RTL Thermal relay slow beating When the thermal relay slow beating trips all outputs are off and the machine sets at STOP Alarm RTL will be displayed till the alarm is active...

Page 22: ...STARGEL Stargel 2018 04 rev 03 22 EN...

Page 23: ...rts Manually wash the parts in water max 60 C using a non aggressive detergent and the clean ing brushes supplied as standard Use drinking water bacteriologically pure to rinse the parts To sanitise l...

Page 24: ...mble the beater hold it with both your hands and deeply push and rotate it so as to insert the shaft into its seat thoroughly Remove the stuffing box from its seat on the beater shaft pos 28 Wash the...

Page 25: ...drops are found on withdrawing drip drawer placed at the machine side Keeping on operating the machine after finding ice cream drops brings about a bigger leakage from stuffing box thence a malfunctio...

Page 26: ...zed parts with hands napkins or else WARNING Before starting again with ice cream production rinse thoroughly with just water in order to remove any residue of sanitizing solution 5 10 HYGIENE Ice cre...

Page 27: ...ervicing operations Cleanout and replacement of stuffing box Cleaning should be carried out at the end of a working day whilst replacement only after check ing of stuffing box and in the event product...

Page 28: ...rificant tube 830 Ice cream spatula 840 28 304 291 830 840 475 772A 72 Fig 15 6 4 ORDERING SPARE PARTS When one or more parts are worn out or broken place the order through your local distributor WARN...

Page 29: ...es not circulate at least 50 cm from wall Clean condenser from obstructions After 30 minutes processing No gas Check leakage and weld mix has not frozen and the machine returns to Stop Pressure switch...

Reviews: