Manufacturer of Quality Air Conditioning and Heating Products • www.islandaire.com • sales@islandaire.com • (800)-886-2759
19
Installation - Wall Plenum
CaUtIon!
to prevent damage, this unit should not be operated to provide supplementary heat-
ing and cooling during the construction period. The unit is designed for operation in a normal indoor envi-
ronment. operating this unit in an unenclosed space or exposure to construction environment may result in
permanent equipment damage.
The following is the sequence of steps for installing the Islandaire VTAC unit:
1
Install Wall Plenum Assembly
6
Attach Discharge Plenum to Top of Chassis
2
Level Drain Pan - Cut legs to proper height
and level Drain Pan using Leveling Screws
7
Install flexible duct to Discharge Plenum
3
Install Exterior Louver
8
Make unit power connections
4
Install Condensate Piping
9
Make thermostat connections
5
Place Chassis on Drain Pan, slide in and
secure to Wall Plenum (using latches)
10 Install Interior Access Panel/Grille
EXTERIOR
LOUVER
WALL
PLENUM
ASSEMBLY
CHASSIS
DRAW
LATCH (3X)
DETAIL A
SEE
DETAIL A