
International HS 2.8L
Pistons and Connecting Rods
7 2
Service Manual - 8120081 - 05/02
INTERNATIONAL ENGINES
10. Check clearance between piston rings ends
in cylinder. Clearance must be checked
separately. Use piston to introduce the ring
between 40 and 50 mm below block surface.
Cylinder bore must be within specified
measures. See the correct clearance
between ends below.
Clearance between
ends
Millimeters
0.400
0.600
1st groove,
compression ring
2nd groove,
compression ring
0.300
0.550
3rd groove,
oil ring
0.300
0.550
Assembly:
1.
To assembly, all parts must be cleaned.
Assembly bushing in connecting rod, making
sure that lubrication holes are aligned.
Machine bushing inner diameter.
2.
Assembly piston in connecting rod, with
combustion chamber turned to the same
side of the shell lock. Manually install pin and
snap rings. If it is difficult to assembly the pin,
heat the piston in water or oil at 80 °C (176
°F). The piston must be carefully handled,
because any damage on its surfaces may
cause bad engine operation. Assembly
connecting rod and piston in the same
cylinder whether they have not been
replaced.
Summary of Contents for HS 2.8L
Page 1: ...SERVICE MANUAL International HS 2 8L...
Page 4: ...3 International HS 2 8L 8120081 05 02 Service Manual INTERNATIONAL ENGINES SAFETY PRECAUTIONS...
Page 6: ...5 International HS 2 8L 8120081 05 02 Service Manual INTERNATIONAL ENGINES ENVIRONMENT...
Page 9: ...International HS 2 8L 8 Service Manual 8120081 05 02 INTERNATIONAL ENGINES TECHNICAL FEATURES...
Page 21: ...International HS 2 8L 20 Service Manual 8120081 05 02 INTERNATIONAL ENGINES COOLING SYSTEM...
Page 28: ...27 International HS 2 8L 8120081 05 02 Service Manual INTERNATIONAL ENGINES FUEL SYSTEM...
Page 42: ...41 International HS 2 8L 8120081 05 02 Service Manual INTERNATIONAL ENGINES LUBRICATION SYSTEM...
Page 64: ...International HS 2 8L 63 INTERNATIONAL ENGINES 8120081 05 02 Service Manual ENGINE BLOCK...
Page 77: ...International HS 2 8L 76 Service Manual 8120081 05 02 INTERNATIONAL ENGINES CRANKSHAFT...
Page 84: ...International HS 2 8L 83 INTERNATIONAL ENGINES 8120081 05 02 Service Manual CRANKSHAFT PULLEY...
Page 90: ...International HS 2 8L 89 INTERNATIONAL ENGINES 8120081 05 02 Service Manual ENGINE TIMING...
Page 98: ...International HS 2 8L 97 INTERNATIONAL ENGINES 8120081 05 02 Service Manual FLYWHEEL...
Page 102: ...101 International HS 2 8L 8120081 05 02 Service Manual INTERNATIONAL ENGINES ACCESSORIES...
Page 126: ...125 International HS 2 8L 8120081 05 02 Service Manual INTERNATIONAL ENGINES SPECIAL TOOLS...