![Interlogix UltraView PTZ Installation Manual Download Page 36](http://html1.mh-extra.com/html/interlogix/ultraview-ptz/ultraview-ptz_installation-manual_2077199036.webp)
UltraViews PTZ
Installation Manual
26
Setting the termination
You must set the termination of the data signal in each dome (or device) to on or off. Only two of the four
switches (3 and 4) on the DIP switch block are used (
Figure 23
). Switches 1 and 2 are not used at this time, so
it does not matter whether they are set to on or off.
Figure 23.Termination switches
To set the termination, do the following:
1. Set both termination switches to
on
if the dome or device is the final receiver location for the data
signal or if it is only device on the data signal bus.
2. Set both termination switches to
off
if the data signal needs to loop out to other domes or devices.
Note:
The switches are set to
off
by default.
C
ALM1
ALM3
C
ALM2
C
ALM4
C
COM1
NO1
NC1
COM2
NO2
NC2
A A
U
X
B 485
A 4
8
5
UTP
‒
UTP
+
B AUX
Main
Auxiliary
Summary of Contents for UltraView PTZ
Page 1: ...UltraView PTZ Installation Manual...
Page 6: ...UltraView PTZ Installation Manual vi...
Page 10: ...UltraView PTZ Installation Manual x...
Page 18: ...UltraView PTZ Installation Manual 8...
Page 46: ...UltraView PTZ Installation Manual 36...