Chapter 5 - Upgrading the System 65
8.
Restart the system. If you installed an ISA board, the installation is
complete. If you installed a PnP board, notice when the following
message displays.
Hit DEL if you want to run SETUP
9.
Press
DELETE
to run AMIBIOS Setup.
10.
When the main menu displays, select the Advanced Setup icon.
11.
Click on the Boot to PnP Operating System parameter and select Yes
in the Options menu; then, press
ENTER
.
12.
Exit AMIBIOS Setup and restart the system.
You may need to load device drivers to enable the new option board to
operate. If so, refer to the documentation provided with the option board.
Using the System Configuration Utility
The SCU is an MS-DOS utility that will not run in the Windows NT
environment. Use the System Utilities (SYSUTIL) diskette delivered with
your system to boot the system into MS-DOS. The system must be set to
boot from the floppy disk drive (normally drive A) to use the SCU. If
necessary, follow this procedure to change the workstation boot sequence.
➤
To change the workstation boot sequence:
1.
Restart the workstation. The American Megatrends banner screen
displays with the following message:
Press DEL if you want to run Setup
2.
Press
DELETE
. The AMIBIOS Setup Main Menu displays.
3.
Click on the Advanced icon. A list of parameters displays.
4.
Click on the System Boot Up Sequence parameter. The Options menu
displays with choice of boot sequences. The default is C:, A:, which
designates the system hard disk drive (C:) is the initial device,
followed by the floppy disk drive (A:).
Summary of Contents for TDZ-300
Page 1: ...TDZ 300 TDZ 400 Desktop Setup and Maintenance Guide March 1996 ...
Page 28: ...14 Chapter 1 Getting Started ...
Page 44: ...30 Chapter 3 Opening and Closing the Base Unit ...
Page 68: ...54 Chapter 4 Maintaining the System ...
Page 84: ...70 Chapter 5 Upgrading the System ...
Page 110: ...96 Chapter 8 Troubleshooting ...
Page 132: ...118 Appendix B Hardware Information ...
Page 136: ......