Intel® Server System M20NTP1UR - System Integration and Service Guide
98
8.
If present, place other packaged ship along items within the cutouts of the top foam packaging
sections.
9.
Close the flaps of the inner box. Short flaps 1
st
, followed by long flaps.
10.
Close the flaps of the outer box. Short flaps 1
st
, followed by long flaps.
11.
Seal the entire package with tape as shown in the following figure.
Summary of Contents for M20NTP1UR
Page 2: ...2 This page intentionally left blank...
Page 101: ...Intel Server System M20NTP1UR System Integration and Service Guide 101 1 2 3 4 5...
Page 102: ...Intel Server System M20NTP1UR System Integration and Service Guide 102 1 2 3 4 5 6 1 2 3...
Page 103: ...Intel Server System M20NTP1UR System Integration and Service Guide 103 1 2 3 4 5...
Page 112: ...Intel Server System M20NTP1UR System Integration and Service Guide 112 1 2 3 4 5 ESD 6 1 2 3...
Page 113: ...Intel Server System M20NTP1UR System Integration and Service Guide 113 1 2 3 4 5...