18
STEP 12
1. Remove the top or bottom
pulley (18) from each pulley holder (13) by removing the 2x 3/8 ”x1-
3 / 4” hex bolts (34) and 2x 3/8” nylon nuts (46), see. below.
2. Pass the cable with the ball (26) through the 2x pulleys (18) on the left pulley holder (13).
3. Reattach the top pulley (18) to the left pulley bracket (13) using the 3/8
” x1-3 / 4” hex bolts (34)
and 3/8
” nylon nut (46).
4. Pass the cable (26) through the pulleys (18) on the right pulley holder (13), see. below.
5. Reattach the lower pulley (18) to the right pulley holde
r (13) using the 3/8 ”x1-3 / 4” hex bolts
(34) and 3/8 ”nylon nut (46).