background image

CAUTION

4

Make sure that the roof liner sheet has been
fitted.

 

If not, fit the protective plastic sheet.

4

Battens 

Z

E

 and 

R

 must be of the same thickness

as the existing battens.

4

Respect the dimension of 550 mm. If necessary, add

an extra batten.

4.5.4.

Clearance to allow for

Number of panels 1

2

3

4

5

Size 

A

1920 2980 4040 5100 6160

M002136-B

>A

>3

70

0

NEO 2.1 / SUN 211

4. Installation

20/02/2013 - 300024195-001-02

20

Summary of Contents for NEO 2.1

Page 1: ...EN Flat solar panels NEO 2 1 SUN 211 Installation and Service Manual Roof integral Installation 17 to 65 mechanical tiles 300024195 001 02 ...

Page 2: ... Package list 11 4 3 Main dimensions 14 4 4 Installation diagrams 15 4 4 1 Vertical assembly juxtaposed 15 4 4 2 Example of an installation 16 4 5 Assembling the solar collectors 17 4 5 1 Warning 17 4 5 2 Tools required 18 4 5 3 Dimensions 19 4 5 4 Clearance to allow for 20 4 5 5 Fitting the battens 21 4 5 6 Mounting for an installation with 2 collectors 22 4 5 7 Mounting for a system with up to 5...

Page 3: ...5 Commissioning 70 5 1 Check points before commissioning 70 5 2 Commissioning 70 6 Checking and maintenance 71 6 1 General instructions 71 7 Spare parts 72 7 1 General 72 7 2 Spare parts 72 Contents 2 20 02 2013 300024195 001 02 ...

Page 4: ...3 20 02 2013 300024195 001 02 ...

Page 5: ... of the appliance DANGER Risk of a dangerous situation causing serious physical injury WARNING Risk of a dangerous situation causing slight physical injury CAUTION Risk of material damage Signals important information Signals a referral to other instructions or other pages in the instructions Caution Risk of being burnt Zone susceptible to snow Zone susceptible to windy conditions NEO 2 1 SUN 211 ...

Page 6: ...ler must respect the following instructions 4 Read and follow the instructions given in the manuals provided with the appliance 4 Carry out installation in compliance with the prevailing legislation and standards 4 Perform the initial start up and carry out any checks necessary 4 Explain the installation to the user 4 If a maintenance is necessary warn the user of the obligation to check the appli...

Page 7: ... a person responsible for their safety of supervision or prior instructions regarding use of the appliance Care should be taken to ensure that children do not play with the appliance To prevent hazardous situations from arising if the mains lead is damaged it must be replaced by the original manufacturer the manufacturer s dealer or another suitably skilled person NEO 2 1 SUN 211 1 Introduction 20...

Page 8: ...he connections it is imperative that the standards and corresponding local directives are respected 4 The flat solar panels and fittings should be handled carefully during transportation and storage If the packing has nevertheless been damaged during transit the damage must be reported immediately to and claimed against the carrier 4 The contents of the assembly kit must be checked before installa...

Page 9: ...nergy An intelligent control system ensures that the circulation system is only active when there is sufficient solar radiation thus optimising the collection of solar energy 3 2 Technical specifications 3 2 1 Solar collectors Length mm 1960 Width mm 1060 Height mm 70 Weight kg 34 45 Gross collector area AG m2 2 1 Inlet surface Aa m2 1 88 Absorber surface AA m2 1 90 Water content litres 1 2 Maximu...

Page 10: ...3 2 2 Load loss curve A Pressure drop mbar Z Mass flow Kg h 0 50 100 150 200 250 300 350 400 0 50 100 150 200 250 300 1 2 M002031 A 3 Technical description NEO 2 1 SUN 211 9 20 02 2013 300024195 001 02 ...

Page 11: ... of the environment Place a container of sufficient volume under the drain pipe and the valve discharge pipe 4 The roof mounting pack makes it possible to install the solar collectors on roofs with structures presenting a minimum incline of 17 4 The roof integral installation set is designed specifically as a mounting system for the NEO 2 1 flat solar panels and may only be used in accordance with...

Page 12: ...4 2 Package list M001801 B ER45 ER193 5x 5x 2x 2x M001802 B ER194 ER195 10x 10x 4x 4x 5x 5x 2x 2x 4 Installation NEO 2 1 SUN 211 11 20 02 2013 300024195 001 02 ...

Page 13: ...M002133 C ER190 ER191 7x 7x 10x 10x 10x 12x 2x 1x 2x 20x 12x 1x M002134 C ER192 1x 2x 2x 1x 1x 2x 2x 2x 1x 30 ER236 C003463 C NEO 2 1 SUN 211 4 Installation 20 02 2013 300024195 001 02 12 ...

Page 14: ...5204 Sheet metal plate kit for 1 collector 1 ER 191 100015205 Sheet metal plate kit for 2 collectors 1 1 1 1 ER 192 100015206 Sheet metal plate kit for extension 1 2 3 ER 235 100017997 Waterproofing kit for integration of 1 collectors 1 ER 236 100017998 Waterproofing kit for integration of 2 collectors 1 2 3 4 ER 67 100013503 Hydraulic connection kit 1 1 1 1 1 ER 68 100013504 Hydraulic connection ...

Page 15: ... Main dimensions A Solar collector inlet Z Solar collector outlet E Solar sensor probe M001740 A 1060 113 5 113 5 175 5 37 1960 70 3 2 1 2 3 1 NEO 2 1 SUN 211 4 Installation 20 02 2013 300024195 001 02 14 ...

Page 16: ...he flow side of the solar circuit flow from the hottest collector A Solar sensor probe CAUTION Recommended mounting Sensor A located at the top of the collector CAUTION If sensor A is located at the bottom of the collector it is necessary to use a batten from your delivery of a max height of 45 mm Dimensions page 19 M001754 B A M001775 B A 4 Installation NEO 2 1 SUN 211 15 20 02 2013 300024195 001...

Page 17: ... primary solar 88 Expansion vessel 89 Heat transfer fluid container 109 Domestic hot water thermostatic mixing valve 112a Solar sensor probe 112b Domestic hot water sensor 114 Solar circuit drainage valve 126 Solar regulator 129 Duo Tube 130 Manual bleed degasser 131 Flat or tubular solar panel M001806 C 109 130 89 230V 50Hz 114 61 88 61 61 87 85 4 84 114 NEO 2 1 SUN 211 4 Installation 20 02 2013 ...

Page 18: ...4 5 Assembling the solar collectors 4 5 1 Warning M001748 A 4 Installation NEO 2 1 SUN 211 17 20 02 2013 300024195 001 02 ...

Page 19: ...4 5 2 Tools required M001719 B 10 10 NEO 2 1 SUN 211 4 Installation 20 02 2013 300024195 001 02 18 ...

Page 20: ...en to be fitted supplied R Fixing lugs to be put in place on the starting batten T Protective tarpaulin Number of panels 1 2 3 4 5 Size A 1147 2210 3273 4336 5400 M002135 D 4 4 4 4 4 370 430 1980 2410 A 400 660 660 165 80 10 10 17 65 550 3 5 2 1 4 Installation NEO 2 1 SUN 211 19 20 02 2013 300024195 001 02 ...

Page 21: ...attens Z E and R must be of the same thickness as the existing battens 4 Respect the dimension of 550 mm If necessary add an extra batten 4 5 4 Clearance to allow for Number of panels 1 2 3 4 5 Size A 1920 2980 4040 5100 6160 M002136 B A 3 7 0 0 NEO 2 1 SUN 211 4 Installation 20 02 2013 300024195 001 02 20 ...

Page 22: ...battens A Secure the battens using the screws provided CAUTION Respect the dimension of 550 mm If necessary add an extra batten M002137 C 370 1980 430 550 1 1 4 Installation NEO 2 1 SUN 211 21 20 02 2013 300024195 001 02 ...

Page 23: ... upper fastening lugs in the holding groove on the collectors and screw them onto the batten The solar panels should only be installed shortly before the solar heating system is to be commissioned This will minimise the time that the solar panels are exposed to heat while not filled with heat transporting fluid C003456 F 660 400 200 mini 660 1 2 3 3 3 3 3 1 2 1 2 1 2 1 2 80 165 NEO 2 1 SUN 211 4 I...

Page 24: ...tire height of the 2 collectors 2 Clean the surface before fitting the flat seal to it Glue the intermediary flat seal to the 2 collectors 3 Fit the intermediary clips using the mallet aligning them with the bottom of the collectors C003457 A A A A 1 3 3 3 3 3 1 1 2 2 2 4 Installation NEO 2 1 SUN 211 23 20 02 2013 300024195 001 02 ...

Page 25: ...he 2 collectors 1 Slide the second solar panel up to the first The collectors must be fitted perfectly edge to edge 2 Secure the collectors C003458 C B B B B B A 1 1 2 NEO 2 1 SUN 211 4 Installation 20 02 2013 300024195 001 02 24 ...

Page 26: ... into the upper groove on the 2 collectors 2 Clean the surface before fitting the flat seal to it Glue the flat seal along the entire width of the 2 collectors 3 Fit the upper clips using the mallet A C003459 B A 1 2 3 2 1 3 3 3 3 3 A 4 Installation NEO 2 1 SUN 211 25 20 02 2013 300024195 001 02 ...

Page 27: ...rmediate clips 3 Squeeze silicone on to the joints between the mounting components 4 Remove the protective film from the self adhesive foam 5 Glue the self adhesive foam to the covering plate 6 Cover the upper part of the covering plate with silicone 7 Fit the covering plate secure it and spread a veil of silicone over it C003460 E 1 3 6 7 5 4 3 40 2 NEO 2 1 SUN 211 4 Installation 20 02 2013 30002...

Page 28: ... Fitting the foam seal 1 Clean the surface to which the foam seal is to be fitted 2 Glue the foam seal to the top of the upper clip C003462 C 4 Installation NEO 2 1 SUN 211 27 20 02 2013 300024195 001 02 ...

Page 29: ...en the sensor socket and the temperature sensor can be improved by the use of heat conducting paste on the temperature sensor 1 Fit the collector tank connections Tighten the clamping ring screw connections correctly 2 Fit the temperature sensor Push the temperature sensor through the gasket M002140 C C D A B B A C D 1 2 NEO 2 1 SUN 211 4 Installation 20 02 2013 300024195 001 02 28 ...

Page 30: ...and Cable through the Roof A Scenario with two overlapping sheets of film under the roof B Scenario with a single sheet of film under the roof A B M002320 A 4 Installation NEO 2 1 SUN 211 29 20 02 2013 300024195 001 02 ...

Page 31: ... of the 2 collectors 1 Clean the surface before fitting the flat seal to it Glue the flat seal Remove the self adhesive tape at the top of the flat seal 2 Cut the flat seal to the correct length C003461 F 1 2 NEO 2 1 SUN 211 4 Installation 20 02 2013 300024195 001 02 30 ...

Page 32: ...ate in place 4 Check that the rigid flap is flush against the ridge tiles The lead flap should be moulded to the shape of the tiles in order to allow as little daylight as possible between tiles and flap along the entire length 1 Position the lower right roofing plate 2 Position the lower left roofing plate M002141 F 1 3 4 2 4 3 A A A A 4 Installation NEO 2 1 SUN 211 31 20 02 2013 300024195 001 02...

Page 33: ...etween the 2 collectors lower 1 Leave the BUTYL strip loose at the end of the intermediate clips Squeeze silicone on to the joints between the mounting components 2 Coat the inside of the central junction section with silicone 3 Put the central junction section in place 4 Coat the sections with silicone C003923 C 2 4 5 6 6 3 1 NEO 2 1 SUN 211 4 Installation 20 02 2013 300024195 001 02 32 ...

Page 34: ...unting the side roofing plates 1 Put the left side flaps A and B in place Flap A should be placed as far over flap B as it can go to cover it Flaps A and B should be correctly aligned M002142 F 7 8 1 2 3 4 5 6 7 8 A D E B B C 9 9 4 Installation NEO 2 1 SUN 211 33 20 02 2013 300024195 001 02 ...

Page 35: ...ut the right side flaps D and E in place 5 Place the assembly of D E on the lower flap Flap D should be flush with the top of the collector Flap E should be aligned with the bottom of the lower sheet metal plate 6 Fit the side clip F 7 Put the upper junction part in place 8 Put the lower junction part in place 9 Put the screw in place NEO 2 1 SUN 211 4 Installation 20 02 2013 300024195 001 02 34 ...

Page 36: ...connections at the top reposition and tighten the fittings before putting the upper roofing plate in place 1 Hook the right roofing plate on to the upper clip Fold the assembly over downwards while pulling the part upwards M002143 D 1 2 3 4 Installation NEO 2 1 SUN 211 35 20 02 2013 300024195 001 02 ...

Page 37: ...rt the screws n Fitting the fastening lugs and the tile rests 1 Secure the side flaps and the top flaps with the sheet metal plates 2 Position the left tile rest on the upper flap 10 cm from the top Fit the flap to one of the battens using straps Cut the battens added to the original battening level with the side flaps M002144 C 2 3 1 1 1 2 1 1 2 3 3 NEO 2 1 SUN 211 4 Installation 20 02 2013 30002...

Page 38: ...out leaving any space from the lead lug to the top 2 Glue the foam to the edge of the side and top roofing plates If need be adjust to the correct length with a Stanley knife Check the corners of the lead flaps The overhanging lead should be turned over upwards with a downward roof gradient along the width and length fitted under the tiles 4 5 7 Mounting for a system with up to 5 collectors CAUTIO...

Page 39: ...he holding groove on the collectors and screw them onto the batten The solar panels should only be installed shortly before the solar heating system is to be commissioned This will minimise the time that the solar panels are exposed to heat while not filled with heat transporting fluid C003456 F 660 400 200 mini 660 1 2 3 3 3 3 3 1 2 1 2 1 2 1 2 80 165 NEO 2 1 SUN 211 4 Installation 20 02 2013 300...

Page 40: ...ght of the 2 collectors 2 Clean the surface before fitting the flat seal to it Glue the intermediary flat seal to the 2 collectors 3 Fit the intermediary clips using the mallet aligning them with the bottom of the collectors 1 1 C003467 B A A A A A 1 3 3 3 3 3 3 3 3 3 1 2 2 2 2 4 Installation NEO 2 1 SUN 211 39 20 02 2013 300024195 001 02 ...

Page 41: ...he 3 collectors 1 Slide the second solar panel up to the first The collectors must be fitted perfectly edge to edge 2 Secure the collectors C003468 C B B B B B A 1 1 2 NEO 2 1 SUN 211 4 Installation 20 02 2013 300024195 001 02 40 ...

Page 42: ...to the upper groove on the 2 collectors 2 Clean the surface before fitting the flat seal to it Glue the flat seal along the entire width of the 2 collectors 3 Fit the upper clips using the mallet A A C003469 A A 1 2 3 2 1 3 3 3 3 3 3 3 A 4 Installation NEO 2 1 SUN 211 41 20 02 2013 300024195 001 02 ...

Page 43: ...rmediate clips 3 Squeeze silicone on to the joints between the mounting components 4 Remove the protective film from the self adhesive foam 5 Glue the self adhesive foam to the covering plate 6 Cover the upper part of the covering plate with silicone 7 Fit the covering plate secure it and spread a veil of silicone over it C003470 B 1 3 6 7 5 4 3 40 2 NEO 2 1 SUN 211 4 Installation 20 02 2013 30002...

Page 44: ...n Fitting the foam seal 1 Clean the support surface 2 Glue the foam seal to the top of the upper clip C003472 C 4 Installation NEO 2 1 SUN 211 43 20 02 2013 300024195 001 02 ...

Page 45: ...n the sensor socket and the temperature sensor can be improved by the use of heat conducting paste on the temperature sensor 1 Fit the collector tank connections Tighten the clamping ring screw connections correctly 2 Fit the temperature sensor Push the temperature sensor through the gasket M002307 D C D A B B B A C D 1 2 NEO 2 1 SUN 211 4 Installation 20 02 2013 300024195 001 02 44 ...

Page 46: ...and Cable through the Roof A Scenario with two overlapping sheets of film under the roof B Scenario with a single sheet of film under the roof A B M002320 A 4 Installation NEO 2 1 SUN 211 45 20 02 2013 300024195 001 02 ...

Page 47: ... of the 3 collectors 1 Clean the surface before fitting the flat seal to it Glue the flat seal Remove the self adhesive tape at the top of the flat seal 2 Cut the flat seal to the correct length C003471 F 1 2 NEO 2 1 SUN 211 4 Installation 20 02 2013 300024195 001 02 46 ...

Page 48: ...n Mounting the lower roofing plates M002308 F 1 4 3 6 2 5 A A 4 5 6 A A 4 Installation NEO 2 1 SUN 211 47 20 02 2013 300024195 001 02 ...

Page 49: ...allow as little daylight as possible between tiles and flap along the entire length 1 Position the lower right roofing plate 2 Position the lower central roofing plate 3 Position the lower left roofing plate 4 Put the lower right roofing plate in place Put the lower right clip in place 5 Put the lower central roofing plate in place Put the lower central clip in place 6 Put the lower left roofing p...

Page 50: ...he joints between the mounting components 2 Coat the inside of the central junction section with silicone 3 Put the central junction section in place 4 Coat the sections with silicone 5 Fold the BUTYL strip back on to the junction section 6 Secure the junction section C003924 B 2 4 5 6 6 3 1 4 Installation NEO 2 1 SUN 211 49 20 02 2013 300024195 001 02 ...

Page 51: ...ide flaps A and B in place Flap A should be placed as far over flap B as it can go to cover it Flaps A and B should be correctly aligned M002309 G 1 2 3 4 5 6 7 8 8 7 8 9 9 7 A B D E F B C 9 NEO 2 1 SUN 211 4 Installation 20 02 2013 300024195 001 02 50 ...

Page 52: ... be placed as far over flap E as it can go to cover it Flaps D and E should be correctly aligned 5 Place the assembly of D E on the lower flap Flap D should be flush with the top of the collector Flap E should be aligned with the bottom of the lower sheet metal plate 6 Fit the side clip F 7 Put the upper junction parts in place 8 Put the lower junction parts in place 9 Insert the screws 4 Installa...

Page 53: ...efore putting the upper roofing plate in place 1 Hook the right roofing plate on to the upper clip Fold the assembly over downwards while pulling the part upwards 2 Hook the central roofing plate on to the upper clip Fold the assembly over downwards while pulling the part upwards M002310 D 1 2 3 4 NEO 2 1 SUN 211 4 Installation 20 02 2013 300024195 001 02 52 ...

Page 54: ...the screws n Fitting the fastening lugs and the tile rests 1 Secure the side flaps and the top flaps with the sheet metal plates 2 Position the left tile rest on the upper flap 10 cm from the top Fit the flap to one of the battens using straps Cut the battens added to the original battening level with the side flaps M002311 C 2 3 4 1 1 1 1 1 2 3 4 2 3 4 4 Installation NEO 2 1 SUN 211 53 20 02 2013...

Page 55: ...Putting the foam in place 1 Remove the self adhesive strip Clean the outside edge of the side lugs Glue the foam strips along the entire length of the kit without leaving any space from the lead lug to the top 2 Glue the foam to the edge of the side and top roofing plates If need be adjust to the correct length with a Stanley knife Check the corners of the lead flaps The overhanging lead should be...

Page 56: ...d screw them onto the batten Respect the dimension of 245 mm from the tiled area when fitting the fastening lugs and 80 mm from the edge of the tiles to the collector to avoid having to cut tiles along one edge The solar collector must be mounted shortly before commissioning the solar system This minimises the time during which the collector is heated pointlessly without heat transporting fluid 66...

Page 57: ...l and the upper clip 1 Clean the surface before fitting the flat seal to it Glue the flat seal 2 Fit the upper clip using the mallet C003464 B A 1 2 1 2 2 A NEO 2 1 SUN 211 4 Installation 20 02 2013 300024195 001 02 56 ...

Page 58: ...t and the temperature sensor can be improved by the use of heat conducting paste on the temperature sensor 1 Fit the collector tank connections Tighten the clamping ring screw connections correctly 2 Fit the temperature sensor Push the temperature sensor through the gasket A M002314 D B C A 2 1 B C 4 Installation NEO 2 1 SUN 211 57 20 02 2013 300024195 001 02 ...

Page 59: ...and Cable through the Roof A Scenario with two overlapping sheets of film under the roof B Scenario with a single sheet of film under the roof A B M002320 A NEO 2 1 SUN 211 4 Installation 20 02 2013 300024195 001 02 58 ...

Page 60: ...wer length of the collector 1 Clean the surface before fitting the flat seal to it Glue the flat seal Remove the self adhesive tape at the top of the flat seal 2 Cut the flat seal to the correct length C003473 E 1 2 4 Installation NEO 2 1 SUN 211 59 20 02 2013 300024195 001 02 ...

Page 61: ...e 4 Check that the rigid flap is flush against the ridge tiles The lead flap should be moulded to the shape of the tiles in order to allow as little daylight as possible between tiles and flap along the entire length 1 Position the lower plate 2 Put the lower sheet metal plate in place 3 Fit the lower clip M002315 E B 1 2 3 A A A A NEO 2 1 SUN 211 4 Installation 20 02 2013 300024195 001 02 60 ...

Page 62: ... on the lower flap Flap A should be flush with the top of the collector Flap B should be aligned with the bottom of the lower sheet metal plate 3 Fit the side clip C 4 Put the right side flaps D and E in place Flap D should be placed as far over flap E as it can go to cover it Flaps D and E should be correctly aligned M002316 G 1 2 3 4 5 6 A D B E F C B 4 Installation NEO 2 1 SUN 211 61 20 02 2013...

Page 63: ...of the collector Flap E should be aligned with the bottom of the lower sheet metal plate 6 Fit the side clip F n Fitting the foam seal 1 Clean the support surface 2 Glue the foam seal to the top of the upper clip C003465 C NEO 2 1 SUN 211 4 Installation 20 02 2013 300024195 001 02 62 ...

Page 64: ...ghten the fittings before positioning the upper roofing plate 1 Hook the roofing plate into the upper clip Fold the assembly over downwards while pulling the part upwards 2 Check that the lugs on the side flaps are slotted into the part on top of the roofing units M002317 E 1 2 4 Installation NEO 2 1 SUN 211 63 20 02 2013 300024195 001 02 ...

Page 65: ...with the sheet metal plates 2 Fit the tile rest to the top flap 10 cm from the top Fit the flap to one of the battens using straps Cut the battens added to the original battening level with the side flaps M002318 C 2 1 1 1 1 1 2 2 NEO 2 1 SUN 211 4 Installation 20 02 2013 300024195 001 02 64 ...

Page 66: ...ead lug to the top 2 Glue the foam to the edge of the side and top roofing plates If need be adjust to the correct length with a Stanley knife Check the corners of the lead flaps The overhanging lead should be turned over upwards with a downward roof gradient along the width and length fitted under the tiles M002319 E 7x 2 2 2 1 2 4 Installation NEO 2 1 SUN 211 65 20 02 2013 300024195 001 02 ...

Page 67: ...the tiles in place A Ridge or bevelled tile Z Roof tile to be cut according to position E Roof tile cut to approximately 260 mm 1 2 3 3 1 2 M002146 D NEO 2 1 SUN 211 4 Installation 20 02 2013 300024195 001 02 66 ...

Page 68: ...ncorrect high point with no air vent E Correct high point with air vent R Location of manual bleed valve degasser 4 6 2 Connecting CAUTION Soft soldering are not authorized The use of flux promotes corrosion conditions in systems operating with propylene glycol as heat transfer fluid In all cases the inside of the pipes must be flushed 4 Use of a hacksaw is prohibited 4 Pipe connections by compres...

Page 69: ...Do not fill rinse a hot solar collector Risk of being burnt 4 Before the filling of the installation to check the preload of the expansion vessel according to the static height Preload static Height 10 0 3 bar 4 check the connection to the series of collectors and the collector sensor connection 4 Since propylene glycol leaks much more easily than water check all connections and gaskets for leaks ...

Page 70: ...sting pressure 4 bar 4 Test time minimum 1 hour 4 Pressure gauge 39 Filling pump 61 Thermometer 84 Stop valve with releasable non return valve 85 Primary solar circuit pump 87 Safety valve calibrated at 6 bar 88 Solar expansion vessel 89 Heat transfer fluid container 112b Domestic hot water sensor 114 Primary solar circuit filling and draining device a propylene glycol 126 Solar regulator 130 Manu...

Page 71: ...tions particularly the earth 4 Check that the sensors are correctly positioned 4 Check that the sensors are operating correctly 4 Check and ensure that the sensor and 230 V cables are separated 5 2 Commissioning Commissioning the solar circuit See solar hot water calorifier instructions See the instructions supplied with the solar control unit and any remote control unit used NEO 2 1 SUN 211 5 Com...

Page 72: ...minimum of 2 bars 4 Check that the sensors are operating correctly 4 Check the safety devices particularly the valve or safety unit referring to the instructions provided with these components 4 Check the antifreeze power of the heat transporting fluid Minimum 20 C 4 Check the pH of the heat transporting fluid it should be between 7 and 8 4 Clean the surface of the solar collectors using a soft da...

Page 73: ... replaced use only original spare parts or recommended spare parts and equipment To order a spare part give the reference number shown on the list 7 2 Spare parts Spare parts list reference 300024195 002 B M002303 B ER190 ER191 7x 7x 10x 10x 10x 12x 2x 1x 2x 20x 12x 1x 1 2 3 4 NEO 2 1 SUN 211 7 Spare parts 20 02 2013 300024195 001 02 72 ...

Page 74: ...ctor 9 200017413 Screws ER 45 10 100013470 Collector NEO 2 1 ER 193 ER 194 ER 195 13 200017620 Bottom retaining lugs 14 200017621 Top retaining lugs ER 67 16 300021241 Reduction 18 15 17 300021242 Reduction 18 16 18 300021243 PT 1000 sensor ER 68 20 300002002 12 x 12 cleat fitting M002304 A ER192 ER45 2x 2x 1x 1x 2x 2x 2x 1x 9 7 8 10 M002305 B ER193 ER194 ER195 ER67 ER68 16 18 17 13 14 20 7 Spare ...

Page 75: ...NEO 2 1 SUN 211 7 Spare parts 20 02 2013 300024195 001 02 74 ...

Page 76: ...ological information contained in these technical instructions as well as any drawings and technical descriptions supplied remain our property and shall not be multiplied without our prior consent in writing 20 02 2013 300024195 001 02 ...

Reviews: