3. Position the central tile rest on the upper flap 10 cm from the
top.
Fit the flap to one of the battens using straps.
Cut the battens added to the original battening level with the side
flaps.
4. Position the right tile rest on the upper flap 10 cm from the top.
Fit the flap to one of the battens using straps.
Cut the battens added to the original battening level with the side
flaps.
n
Putting the foam in place
1. Remove the self-adhesive strip.
Clean the outside edge of the side lugs.
Glue the foam strips along the entire length of the kit without
leaving any space (from the lead lug to the top).
2. Glue the foam to the edge of the side and top roofing plates. If
need be, adjust to the correct length with a Stanley knife.
Check the corners of the lead flaps. The overhanging lead should
be turned over upwards with a downward roof gradient along the
width and length fitted under the tiles.
M002312-E
(8x)
2
2
2
1
2
NEO 2.1 / SUN 211
4. Installation
20/02/2013 - 300024195-001-02
54