n
Putting the foam in place
1. Remove the self-adhesive strip.
Clean the outside edge of the side lugs.
Glue the foam strips along the entire length of the kit without
leaving any space (from the lead lug to the top).
2. Glue the foam to the edge of the side and top roofing plates. If
need be, adjust to the correct length with a Stanley knife.
Check the corners of the lead flaps. The overhanging lead should
be turned over upwards with a downward roof gradient along the
width and length fitted under the tiles.
M002319-E
(7x)
2
2
2
1
2
4. Installation
NEO 2.1 / SUN 211
65
20/02/2013 - 300024195-001-02