Installation Manual
Ingecon® Sun Three-Phase Inverter
Pg. 8 de 40
Ref.: AAS2000IKI02
Rev.:_ Dec-2009
2 Assembly
General Provisions:
The Ingecon® Sun Inverter must be installed by qualified personnel only, in
conformity with the general provisions on safety described herein. The Inverter
works under currents and voltages that may be dangerous to the operators.
In case of high level of humidity or excess of condensation water inside the device,
dry it carefully before carrying out any electric connection.
2.1 Delivery and Unpacking
Delivery
Upon delivery of the device, check the details on the delivery note, fill out the RECIPIENT
SIGNATURE field and return it to the sender’s address.
The following table shows the specifications of the packing pallets:
Device handling
The following provisions strictly apply to any handling operation of the device
outside the factory premises.
In case of non-compliance with these provisions, the warranty may become null
and void without any responsibility of INGETEAM.
The Inverter must be placed VERTICALLY, even in case it is necessary to return it to
the factory.
Avoid collisions and brisk movements.
Use a fork lift to transport the device.
Follow the basic provisions below:
1. Unscrew the front and rear covers of the base (never unscrew the side ones).
2. Insert the forks at their maximum width under the cabinet.
3. Insert the forks until they come out the opposite side of the cabinet, so as to ensure
the stability of the device.
4. Make sure the forks are correctly levelled to prevent the device from tilting.
5. After placing the device in its definitive position, re-install the base covers.
MODEL
PALET TYPE
WEIGHT
(Kg)
HEIGHT/WIDTH/LENGTH (mm)
20 kW , 25
kW y 30 kW
Wooden:Bubble
wrap and woo-
den box
340
1300 / 750 / 600