There are three different states:
Not performed
No autotest running and none has been performed during the time in which the inverter has
been switched on.
Reconnection
State awaiting reconnection for the next measurement after an Fmax, Fmin, Vmax or Vmin
check.
Completed
A full autotest has been carried out during the time in which the inverter has been switched on.
To start the autotest, press
on
Start Autotest
. Access
Result
to consult the results of the different tests,
observing whether the result is correct or incorrect. An autotest can be stopped when running by pressing
on
Stop Autotest
.
The results screens for an autotest are then displayed if the test has been completed and a second case in which
the test has not been completed:
2016-01-11
10:17
2016-01-11
10:17
2016-01-11
10:17
2016-01-11
10:17
Autotest complete, correct result
Autotest not complete, no result
10.24. Change display language
To change display language, access
the Main menu
>
Settings
>
Languages
.
10.25. Change date and time
To change the inverter's date and time access
Main menu
>
Settings
>
Date & time
.
10.26. Perform a partial delete of accumulated data
These inverters have total and partial meters for energy produced, connected time to grid and number of
connections to grid made. This data may be viewed in
Main menu
>
Monitoring
.
If you wish to delete the partial meters, access
Main menu
>
Settings
>
Partial delete
.
10.27. Block inverter screen
If you want to block the keypad/screen together to avoid undesired changes access
Main menu
>
Advanced settings
>
Block display
and enable the block. To unblock it, press
in this order for three seconds. Re-access
Main menu
>
Advanced settings
>
Block display
and disable block.
Pressing
you access the configured country / regulations information.
98
Display control
Ingeteam
ABE2011IQM01_C - Installation and Operation Manual
Summary of Contents for INGECON SUN 1Play TL M
Page 58: ...Anmerkungen Notes Notas Remarques Note Notas...
Page 108: ...Anmerkungen Notes Notas Remarques Note Notas...
Page 309: ...Anmerkungen Notes Notas Remarques Note Notas...
Page 310: ...Anmerkungen Notes Notas Remarques Note Notas...
Page 312: ...Ingeteam Power Technology S A www ingeteam com ABE2011IQM01_C 06 2016...